My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012713
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
18350
>
2600 - Land Use Program
>
PA-1900261
>
SU0012713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:40 AM
Creation date
12/26/2019 2:01:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012713
PE
2626
FACILITY_NAME
PA-1900261
STREET_NUMBER
18350
Direction
E
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95215-
APN
18314010
ENTERED_DATE
12/24/2019 12:00:00 AM
SITE_LOCATION
18350 E HWY 4
RECEIVED_DATE
12/23/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> � Elcctrlc Comprany' <br /> Attachment 2—Electric Facilities <br /> It is PGBE's policy to permit certain uses on a case by case basis within its eledrlc <br /> transmission fee strips) and/or easements) provided such uses and manner In which they are <br /> exercised, will not intertere with PGBE's righks or endanger its facilities. Some <br /> examples/restrictions are as follows: <br /> 7. Buildings and Other Structures: No buildings or other structures including the foot print and <br /> cava of any buildings, swimming pools, wells or similar structures will be permitted within fee <br /> strips) and/or easements) areas. PGBE's transmission easement shall be desig naked on <br /> subdivision/parcel maps as"RESTRICTED USE AREA—NO BUILDING:' <br /> 2. Grading: Cuts, trenches or excavations may not be made within 25 Faet of our towers. <br /> Developers must submit Brading plans and site development plans(including geotechnical <br /> reports if applicable), signed and dated, for PGBE's review. PGBE engineers must review grade <br /> changes in the vicinity of our towers. No fills will be allowed which would impair ground-to- <br /> conductor clearances.Towers shall not be left on mounds without adeq uata road access to <br /> base of tower or structure. <br /> 3. Fences:Walls, fences, and other structures must ba installed at locations that do not affect <br /> the safe operation of PGB's facilities. Heavy equipment access to our facilities must be <br /> maintained at all times. Metal Fences are to be grounded to PGBE specifications. No wall, fence <br /> or other like structure is to be installed within tO feet of tower footings and unrestricted access <br /> must be maintained from a tower structure to the nearest street.Walls,fences and other <br /> structures proposed along or within the fee strips) and/or easament(s)will require PGBE <br /> review; submit plans to PGBE Centralized Review Team for review antl comment. <br /> 4. Landscaping Vegetation may be allowed; subject to review of plans. On overhead electric <br /> transmission fee stdp(s)and/or easement(s),trees and shrubs are limited to those varieties that <br /> do not exceed 15 feet in height at maturity. PGBE must have access to its facilities at all times, <br /> including access by heavy equipment. No planting is to occur within the footprint of the tower <br /> legs. Greenbelts are encouraged. <br /> 5. Reservoirs, Sumps, Drainage Basins, and Ponds: Prohibked within PGBE's fee strips) <br /> and/or easements)for electric transmission lines. <br /> 6. Automobile Parking: Short term parking of movable passenger vehicles and light trucks <br /> (pickups, vans, ete.) is allowed. The lighting within these parking areas will need to ba reviewed <br /> by PGBE; approval will be on a case by case basis. Heavy equipment access to PGBE facilities <br /> is to be maintained at ail times. Parking Is to clear PGBE structures by at least 1 O feet. <br /> Protection of PGBE factlitles from vehicular traffic is to be provided at developer's expense AND <br /> to PGBE specifications. Blocked-up vehicles are not allowed. Carports, canopies, or awnings <br /> are not allowed <br /> 7. Storage of Flammable, Explosive or Corrosive Materials: There shall be no storage of fuel or <br /> combustibles and no fueling of vehicles within PGBE's easement. No trash bins or incinerators <br /> are allowed. <br /> PGScE Gas and Electric Facilities Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.