Laserfiche WebLink
Pacific Gas and <br /> � Elcctrlc Comprany' <br /> Attachment 2—Electric Facilities <br /> It is PGBE's policy to permit certain uses on a case by case basis within its eledrlc <br /> transmission fee strips) and/or easements) provided such uses and manner In which they are <br /> exercised, will not intertere with PGBE's righks or endanger its facilities. Some <br /> examples/restrictions are as follows: <br /> 7. Buildings and Other Structures: No buildings or other structures including the foot print and <br /> cava of any buildings, swimming pools, wells or similar structures will be permitted within fee <br /> strips) and/or easements) areas. PGBE's transmission easement shall be desig naked on <br /> subdivision/parcel maps as"RESTRICTED USE AREA—NO BUILDING:' <br /> 2. Grading: Cuts, trenches or excavations may not be made within 25 Faet of our towers. <br /> Developers must submit Brading plans and site development plans(including geotechnical <br /> reports if applicable), signed and dated, for PGBE's review. PGBE engineers must review grade <br /> changes in the vicinity of our towers. No fills will be allowed which would impair ground-to- <br /> conductor clearances.Towers shall not be left on mounds without adeq uata road access to <br /> base of tower or structure. <br /> 3. Fences:Walls, fences, and other structures must ba installed at locations that do not affect <br /> the safe operation of PGB's facilities. Heavy equipment access to our facilities must be <br /> maintained at all times. Metal Fences are to be grounded to PGBE specifications. No wall, fence <br /> or other like structure is to be installed within tO feet of tower footings and unrestricted access <br /> must be maintained from a tower structure to the nearest street.Walls,fences and other <br /> structures proposed along or within the fee strips) and/or easament(s)will require PGBE <br /> review; submit plans to PGBE Centralized Review Team for review antl comment. <br /> 4. Landscaping Vegetation may be allowed; subject to review of plans. On overhead electric <br /> transmission fee stdp(s)and/or easement(s),trees and shrubs are limited to those varieties that <br /> do not exceed 15 feet in height at maturity. PGBE must have access to its facilities at all times, <br /> including access by heavy equipment. No planting is to occur within the footprint of the tower <br /> legs. Greenbelts are encouraged. <br /> 5. Reservoirs, Sumps, Drainage Basins, and Ponds: Prohibked within PGBE's fee strips) <br /> and/or easements)for electric transmission lines. <br /> 6. Automobile Parking: Short term parking of movable passenger vehicles and light trucks <br /> (pickups, vans, ete.) is allowed. The lighting within these parking areas will need to ba reviewed <br /> by PGBE; approval will be on a case by case basis. Heavy equipment access to PGBE facilities <br /> is to be maintained at ail times. Parking Is to clear PGBE structures by at least 1 O feet. <br /> Protection of PGBE factlitles from vehicular traffic is to be provided at developer's expense AND <br /> to PGBE specifications. Blocked-up vehicles are not allowed. Carports, canopies, or awnings <br /> are not allowed <br /> 7. Storage of Flammable, Explosive or Corrosive Materials: There shall be no storage of fuel or <br /> combustibles and no fueling of vehicles within PGBE's easement. No trash bins or incinerators <br /> are allowed. <br /> PGScE Gas and Electric Facilities Page 5 <br />