Laserfiche WebLink
Pacific Gas and <br /> & E/ectric Company' <br /> 8. Streets and Roads:Access ko facilities must be maintained at all times. Street lights may be <br /> allowed in the fee strips) and/or easements) but in all cases musk be reviewed by PGBE for <br /> proper clearance. Roads and utilities should cross the transmission easement as nearly at right <br /> angles as possible. Road intersections will not be allowed within the transmission easement. <br /> 9. Pipelines: Pipelines may be allowed provided crossings are held to a minimum and to be as <br /> nearly perpendicular as possible. Pipelines wkhin 25 feet of PGBE structures require review by <br /> PGBE. Sprinklers systems may be allowed; subject to review. Leach Felds end septic tanks ora <br /> not allowed. Construction plans must ba submitted to PGBE for review and approval prior to the <br /> commencement of any construction. <br /> �O. Signs: Signs ora not allowed except in rare cases subject to individual review by PGBE. <br /> 11. Recreation Areas: Playgrounds, parks,tennis courts, basketball courts, barbecue and light <br /> trucks (pickups, vans, etc.) may be allowed; subject to review of plans. Heavy equipment <br /> access to PGBE facilities is to ba maintained at all times. Parking is to clear PGBE structures by <br /> at least 1 O feet. Protection of PGBE facilities from vehicular traffic is to be provided at <br /> developer's expense AND to PGBE specifications. <br /> 12. Construction Activity: Since construction activity will take place near PGBE's overhead <br /> electric lines, please be advised it is the contractor's responsibility to be aware of, and observe <br /> the minimum clearances for both workers and equipment operating near high voltage electric <br /> lines set out in the High-Voltage Electrical Safety Orders of the California Division of Industrial <br /> Safety(I� �// d' /7"tl 8/ b5 2 ht Il, as wall as any other safety regulations. <br /> Contractors shall comply with California Public Utilities Commission General Order 95 <br /> (htt -// p / /GO95/ 95 tartu htmD and all other safety rules. No <br /> construction may occur within 25 feet of PGBE's towers.All excavation activiki¢s may only <br /> commence after 811 protocols has been followed. <br /> Contractor shall ensure the protection of PGBE's kowers and poles from vehicular damage by <br /> <instaliing protective barriers) Plans for protection barriers must be approved by PGBE prior to <br /> construction. <br /> 13. PGBE is also the owner of distribution facilities throughout many of the areas within the <br /> state of California.Therefore, any plans that impact PGBE's facilities must be reviewed and <br /> approved by PGBE to ensure that no impact occurs that may endanger the safe and reliable <br /> operation of Its facilities. <br /> PGSzE Gas and Electric Facilities Page 6 <br />