Laserfiche WebLink
STOCKTON UNIFIED SCHOOL DISTRICT DR. MAR PRONE DENS MEND <br /> FACILITIES SERVICES BOARD OF EDUCATION <br /> 1932 NORTH EL PINAL DRIVE • STOCKTON, CA 95205-2551 JOSE HA. <br /> .LEE MERDO <br /> YER <br /> r J852 y (209) 944-4083 FRANK E.OROZCO <br /> WILLIAM L.PONDER <br /> HILARY ROGERS <br /> r,,� �y , ANN STALLWO I <br /> ag' . �'� �•."Y t•a r_ JAMES L.URBANI <br /> TH <br /> November 27 , 1989 <br /> 19 <br /> Public Health Services <br /> San Joaquin County <br /> Attn: Doug Wilson, R.S. <br /> 1601 East Hazelton Ave. <br /> Stockton, Ca. 95201 <br /> Subject : Underground Storage Tanks at Edison High School , <br /> Franklin High School , Stagg High School , The S .U.S . D. <br /> Corporation Yard and Woodruff Occupational Center <br /> Dear Mr. Wilson: <br /> The Stockton Unified School District wishes to clarify its <br /> intentions regarding its underground storage tanks and the <br /> provisions discussed during administrative hearings on July 24 , <br /> 1989, between Public Health Services and the District . <br /> Stockton Unified School District intends to accomplish the <br /> following: <br /> o Remove all underground tanks at the above mentioned sites <br /> with the exception of the leaded and unleaded gasoline <br /> tanks in its Corporation Yard. A detailed list of tanks to <br /> be removed is attached. <br /> o Replace the 500 gallon gasoline tanks at the three high <br /> schools, the 40w motor oil tank and the waste oil tank in <br /> the Corporation Yard with new aboveground tanks. The <br /> installation of new aboveground tanks will require the <br /> District to engage the services of an electrical engineer <br /> and have plans approved by the State Fire Marshal ' s office . <br /> This requirement is already in progress. The District has <br /> also corresponded with the local fire department regarding <br /> the temporary abandonment of our underground tanks to allow <br /> this project to be coordinated in a cost-effective and <br /> timely manner. A letter from the local fire marshal is <br /> forthcoming. <br /> o The removal of underground tanks and the replacement of <br /> aboveground tanks will be incorporated into one project and <br /> a contract awarded in early Spring, 1990. Estimated target . <br /> date for project completion is June 30 , 1990 . <br />