Laserfiche WebLink
14. S rc �7`�.� U.t/iFi�� �� si✓_i< S7 - /,,.,�L –�f <br /> Nam.til Supply,I—.,or D..I., Nn.,I,I Slraall.l �Cdy f—•'—�lal�r DM.nl T.sl <br /> 15. TANK TO TEST 16. CAPACITY F, <br /> By most accurate ❑Station Chart <br /> Nominal Capacity /�, Doc? capacity chart available Z-�J2l2 ElTankManufacturer's Chart <br /> b.nl„Y LY yo.unn GMIOM Grry <br /> Is there doubt as to True Capacity? /l�"j LJ Company plied with <br /> P Data <br /> W.-and Or.. ❑Charts supplied with Petro Tile <br /> 5..S.cLon'DETE RMINING TANK CAPACITY* ❑Other <br /> 17. FILL-UP FOR TEST 1—R.&K.N. T-1G11- <br /> bIRn G.— ..R...N <br /> SIeB Wai.r Bdlom <br /> IM,wa F,Il up `r v In Kv, <br /> A 12 m G.IIun. / <br /> Fni up STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY 7� /J 1`r` -ZO <br /> T. DMm.,., ?T P,oduc,,n lull Mnt(up to LII pipet `.— a O Ld <br /> 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK Observed Gravity �?• _- VAPOR RECOVERY SYSTEM <br /> q ,4;a,v E <br /> See manual sections applicable.Check below and record procedure In log(26) Observed Temperatures y/ ❑Stage 1 <br /> 7/Lv'.1.-.e' 4— <br /> Water in ttaan� Ell <br /> k High water table in 1tanm <br /> tank excavation. Le(s)being tested with LVLLT Le .Ey .S�' ❑Stage II <br /> ElCJ Yes No Yes GRN. ❑Yes J7'No C O E�I_ <br /> 19. TANK MEASUREMENTS FOR 21, TEMPERATURE/VOLUME FACTOR(a)TO TEST THIS TANK <br /> TSTT ASSEMBLY Is Today Warmer❑ Cooler? <br /> ElProduct in Tank °F Fill-up Product on truck—°F Expected Change(+or <br /> -7 -) <br /> Bottom of tank Grade'..................................... / ' <br /> Add 30”for 4'L............................... 22. Thermal Sendor reading after circulation S7 5 2 s—T°F <br /> dg,M Nwn.l <br /> Add 24'for 3"or air seal....................... —707 <br /> Total tubing to assemble Approximate.... ............ ---'/�' 23. Digits per"F in range of expected mange <br /> 4MFx. <br /> 20. EXTENSION HOSE SETTING 24. -�i�1`Y111Z` tt>_'Z gallons <br /> lank total lop to grade-...... .......... ............. f J - quantity In coefficient of expansion for volume mange in this tank <br /> Extend hose on suction tube 6"or more <br /> lull tank(16 x 17) Involved product pat'F below �— <br /> lank top .. ...................... ..... ....... lS1 25. S� S"�f�>O 9Sty _?✓7 = • O/d/7.P 5-9r-P This is <br /> volume change per°F(24) Digits per°F in test Volume change per mgit test <br /> 'II Fill pipe extends above grade,use top of fill. Flange(23) Compute to 4 decimal places. factor(ai <br /> ARRIVED AT TEST SITE AND MEASURED FOR WATER ON TANK BOTTOM <br /> TRANSPORT TRUCK TOPPED OFF TANK,AND TOOK INVENTORY OF PRODUCT <br /> REMOVED FILL CAP AND SPLASH TUBE.SET-UP TEST EQUIPMENT <br /> 26 30. HYDROSTAT IL 31. yDLUME MEASUREMENTS Y) 34' TEMPERATURE COMPENSATION 38,NET VOIUME 39ICUMUTATfD <br /> LOG OF TEST PROCEDURES PRESSURE RECORD TO 001 GAL USE FACTOR UI CHANGES CHANGE <br /> CONTROL EACH READING <br /> 27, 28. 29. SU.P.N L.- 32. P,odun,n 0'.d- 35. 36. 37 Te,p I.. H,0 , <br /> DATE R—, MMf Gmdwle Re ."i CNnps ppnWI.1,M Adlusim.nl W.f.M BM.um <br /> Record details of setting up N0 a <br /> TIME and ru nning test (Use lull m~B .L cn 6elo,e MMI Produn gy.„py `Irl af,,,„N (,,nsiu,N•�ru, Al wID„ rlr <br /> ❑.nn length of line it needed Runny Rslond Rna,, rwmlp R.cmued i-Im irwcin.,., <br /> alp <br /> /5 til Test Equipment with Product 8 Pump Primed and Running Factor A = /� <br /> FIRST SENSOR READING <br /> START SENSOR READING / V 5 -7 0 O – <br /> 1 CONTINUE HIGH LEVEL TEST /. " S o 5 – 113 J – <br /> r; L 1.0 a1/;246 Y-S <br /> ,..' 7 5/ .o ,' a / t. <br /> ?' 122 <br /> If 3. — 44. .o /.SS f Z V <br /> Z i '• 3- 6 S 3 z ).30 <br /> ;?v✓u " .-27 r•a30 /D 71'3 t. <br /> _2 o o . f. o :O l 3 <br /> z o 20 •/S 3 <br /> I <br /> Test concluded 5/s��-��—found to b6 tlUlht � or not light j <br /> on this day at a "level reading of gallons per hour <br />