My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1998 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:09:00 PM
Creation date
12/26/2019 3:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2010
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Pa-e of —7 <br /> 7. UNDER-DISPENSER CONTAINMENT GDC) TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer C Industry Standard `Professional Engineer <br /> Other(Spic fi) <br /> Test Method Used: Pressure Vacuum HN-drostatic <br /> Other(Speer) <br /> Test Equipment Used: C r Id we 111-,e4 L C kec-n 2 Equipment Resolution: <br /> UDC ft4 LUDC# 3UDC# STS, U,DC# � <br /> UDC Manufacturer: <br /> UDC Material: o !c ��kn ' <br /> ely <br /> UDC Depth: <br /> Height from UDC Bottom to Top / <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to w�ui( awed <br /> testing: Ot r-.e L_ <br /> Portion of UDC Tested Y LW t-F Lele- 3 a) <br /> Does turbine shut down when <br /> UDC sensor detects liquid(bothes ❑No ❑NA �T'es 13No ❑NA �'es ❑No ❑NA ❑Yes o ❑NA <br /> product and water)?` /� <br /> Turbine shutdown response time -/-C',("r-,V_P ru�-� Clime fLe�l �✓a (u�C <br /> Is system programmed for fail- es ❑No ❑NA �'es ❑No ❑NA Yes ❑No ❑NA ❑Yes t o ❑NA <br /> safe shutdown?` <br /> Was fail-safe verified to be <br /> opera ional?* ❑Yes �lo ❑NA ❑Yes No ❑NA ❑Yes WNo ❑NA ❑Yes ❑N ❑NA <br /> Wait time between appl� ing <br /> pressure/vacuum/water-and <br /> starting test /p -,/,,u-4-s- <br /> Test Start Time: F,, — "/,g 1S <br /> Initial Reading(Rj): cyt 1p CcscCP .�s�5 G c CO <br /> Test End Time: 9-' G1 cfa Z r <br /> Final Reading(RF): G,,K1 I--A,� -Ct <br /> Test Duration: - s �1.f ���� <br /> �Ar-,f r, -r-r5 ej a-,,�' Ayr c-..•c <br /> Change in Reading(RF-R,): ,t.;v . .1/ ej" <br /> Pass/Fail Threshold or Criteria: , vaf- 3ar-Y,-- c voS /!�%� c Oas"36d1k-- <br /> Test Result: ass ❑Fail :❑' Pass ❑Fail Pass ❑ FailPass fl,ail <br /> Was sensor removed for testing? '[`-Yes ❑No ❑NA ' -Yes ❑No ❑NA es ❑No ❑NA Yes ❑No NA <br /> Was sensor properly replaced and -�4zs No ❑NA G 1'es ❑No ❑NA f�Yes ❑No G NA Yes ❑No ❑ A <br /> ij <br /> verified functional after testing? <br /> Comments —(include information on repairs made prior to,testing,-and recommended follow-arp for failed tests) <br /> �- <br /> G(11De - ✓at'�l�� !tro*.-•zrtC if � -/ _i ^mt� {�rC' � f2P iG< � t ?S'-t`e�-`E <br /> i <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to a y of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.