My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1998 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:09:00 PM
Creation date
12/26/2019 3:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2010
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Pave t/) of� <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps ❑ <br /> Fill Riser Containment Sumps are Present, but were Not Tested <br /> Test Method Developed By: C' Sump Manufacturerndustn' Standard Professional Engineer <br /> C Other(Specfi) <br /> Test Method Used: ❑ Pressure FE Vacuum ydrostatic <br /> ❑Other(Spec fi) <br /> Test Equipment Used: C? I4,,,j{ft Le,,-P- Equipment Resolution: ,a�Z <br /> Fill Sump #.L Fill Sump # Fill Sump # Fill Sump # <br /> Sump Diameter: <br /> Sump Depth: rf 5- <br /> Height <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: / `7 <br /> Height from Tank Top to Lowest J ;, <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Portion of Sump Tested wq F e✓L He 2 S " Wq Jr.-- 27 i' <br /> Sump Material: �rd�/SSS ,;�Z„�.✓a,5 <br /> Wait time between a ing t ' IV I <br /> pressure/vacuum/ ater nd <br /> starting test: 7'yCx �S O Tib lYr r s <br /> Test Start Time: <br /> Initial Reading(Rj): 0 ry Cex /0 1 <br /> Test End Time: zv / NsO <br /> Final Readin (RF): —�-�5 e4,cfaTest Duration: e)r.�'-e+.eeL-e ,3p r-t:u�e.4-eSChan a in Readin (RF-Rj): ,,,p Pass/Fail Threshold or Criteria: oo S �o��� oos'/3ar-1Test Result: -Pass ❑ Fail 17 Pass ❑Fail ❑ Pass 0 Fail <br /> Is there a sensor in the sump? des ❑No j2Yes ❑No Dyes �j No Yes 1 ❑No <br /> Does the sensor alarm when \ <br /> either product or water is Yes ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NAY es ❑N� ❑NA <br /> detected? 11; / <br /> Was sensor removed for testing? es ❑No ❑NA Yes ❑No ❑NA Q'Yes ❑No 10 NA %❑Yes ❑No�❑NA <br /> Was sensor properly replaced and \ <br /> verified functional after testing? _ yes ❑No ❑NA ;KYes ❑No ❑NA Yes LiNo 1 NA t❑Yes ❑No 1ONA <br /> t <br /> Comments— (include in formation on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.