Laserfiche WebLink
SW'RCB, January 2002 Page 7 of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With S ill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested' - <br /> �Test Method Developed By: Spill Bucket Manufacturer -9'f= Industry Standard Professional Engineer <br /> G Other(Speck) <br /> Test Method-Used: C Pressure G Vacuum G4Hgstatt_6 <br /> G Other(Specif Test Equipment Used: Equipment ResoluSpill Box# Spill Box# I Spill Box # Spill Bot # <br /> Bucket Diameter: I <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: ,fes <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> COmmeldts— (include information on repairs made prior to testing, and recommended ollow-up for ailed tests)- <br /> 7 Q�✓�� i ft �v X r � -te� LIt!!.t a 4'�. :ui� �PG�'!%tr�Y 7?c ,S�y -�'� ��.!i'-fe�'C� �P<.f t . <br />