Laserfiche WebLink
05!30/2007 08:00 FAX f3J005 <br /> SAN.JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE I <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2,CHANGE OF INFORMATION <br /> PLAN TYPE X1 MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. ' <br /> (Check one item only) [] THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): i <br /> I. FACILITY INFORMATION <br /> FACILITY ID>f(Agency Use Onlv) -- — <br /> FACILITY NAME D SCHOOL DIST <br /> M03 <br /> FACILITY SITE ADDRESS 1932 EL PINAL MOA CITY STOCKTON ntaa. <br /> 11. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,kind calibration of monitoring equipment(c.g.,sensors,probes,line leak detectors,etc.)be performed in <br /> aoeordance with the equipment munufaCturels'instructions,or annually,whichever is more frequent. Such work must be pciformcd by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED CQ 1.ANNUALLY ❑ 99.OTHER(Specify): �t <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must Include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each seasor, <br /> line leak detector,monitoring system control panel,etc.). If you alrtady have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,ctc)which shows all required information•include it with this Ian. <br /> IV, TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METIIOD(S):(Check all that apply) Mie. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTI[TIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: III a.DRY ❑ b.LIQUID FILLED ❑ a UNDER PRFSSU &��-�y{ �{ �J 1R VACUUM MI 1 <br /> PANEL MANUFACTURER: INCON M"- MODEL 4: S—IUUU/Lla M13. <br /> LEAK SENSOR MANUFACI-URLR: I NCON MI4. MODEL#(S)'. FX I V �t13 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR STNGLE WALL <br /> PANEL MANUFACTURER "116 MODEL N, "07 <br /> 1N-TANK PROBE MANUFACTURER: '"'R' MODEL fl(S): '11' <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTI.Y ❑ c.WEEKLY <br /> C7 d.MONTHLY ❑ e.OTHER(Specify): M I' <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h, E) b.02 g.p.h, ❑ e.OTHER(Specify): <br /> ❑ 3-INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 SII" <br /> [] 4,WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> 'TESTING PERIOD: 0 a.36 HOURS ❑ b 60 HOURS ' <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§26-43.1 <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. Mr. <br /> 6.VLSUAL MONITORING DONE: / a.DAILY ❑ b.WEEKLY(Requuecageruyapprov l) <br /> 99.OTHER(Spxify): & <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) °46t <br /> 1.CONTINUOUS ELECTRONIC MONITORING 01-PIPING SUMP(S)R7tENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: 99 a.DRY ❑ b.LIQUID FILLED ❑ C.UNDER PRESSURE ❑ d.ME$VACUUM bOt. <br /> PANEL MANUFACTURER; I N C O N M32. MODEL- Y S—1 O QO / C_ tNs1 <br /> LEAK SENSOR MANUFACTURER: M3"� MODEL#(s): TSP U LS M35. <br /> WILL A PIPING I.E.A�K ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? V &YES ❑ b.NO ' <br /> WILL FAILCIRE(DISCONNEC ION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? XM a.YES ❑ b.NO <br /> 2.MECHANICAL, LINF, LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED M3& FX1 D & FX1 er,,. <br /> MLLDMANUFACTURER(s); RED JACKET MODEL#(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: I MID. MODEL#: MM <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.pA ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M4� <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? XO s.YES ❑ b.NO naa <br /> �yy WILL ELLD FAII,URF-(DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN' U e.YES El b.NO <br /> L•I�4.INTEGRITY TESTING <br /> TEST FREQUENCY: k a.ANNUALLY ,❑,y�yy b.EVERY 3 YEARS ❑ c.OTHER(Specify) M"s. 14W <br /> ❑ 5.VISUAL,MONITORING DONE: [j a.a.DAILY b.WEEKLY- ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M1ss7 <br /> •Rcquires gjwcy approval —Allo M for mornwnn;orunbuned ennerzowy y�lor fuel pmim_•only PT 1'1-S[_�52St 5tbX31 <br /> ❑ 6.PIPING IS SUCTION PIPING MEL FING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PCR 23 CCR 4-2636(ax3) <br /> ❑ T NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THL UST(s) <br /> ❑ 99.OTHER(Specily) "tax ) <br /> SJCEHD-d(07/03)-I/4Ty 07/23/03 <br />