My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1998 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:09:00 PM
Creation date
12/26/2019 3:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2010
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/30/2007 08:01 FAX Z006 <br /> UNDERGROUND STORAGE TANK. <br /> MONITORING PLAN-PAGE 2 <br /> VI. DISPENSER MONITORING <br /> 1 MONITORING OF AREAS BLNEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: INCON "151 MODEL,it TS-1000/2—P M12 <br /> LEAK SENSOR MANUFACTURER: INCON M53 MODELa(s):TSP—U LS M54 <br /> WILL DETECTION OF A LEAK INTO TTIE UDC TRIGGER AUDIBLE AND VISUAL Al ARMS? [N a.YES ❑ b NO tirss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? 6 a.YES Elb.NO <br /> WILL.FAILURTJDISCONNECPION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? N a.YES ❑ b.NO K97. <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> yy ASSEM13LYMANUFACTURER M58. MODEL 4(S): <br /> Lwy 3,VISUAL MONITORING DONE: [I7,DAILY El b.WEEKLY(Requin3 acemy apprnyel) M60 <br /> ❑ 4.NO DISPENSERS <br /> 99.OTIIER(Specify) MONTHLY BY UST OPERATOR &46'. <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK MID <br /> DM-r,CTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644,1.ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> RE-:f <br /> ENE <br /> DOCUMENTS MAINTAINED AT FAC1LiTl(Check all that apply) �a <br /> 1. THIS UNDERGROUND STORAGE-LANK MONITORING PLAN(Required) <br /> 2- OPERATING MANUALS FOR F1 ECIRONIC <br /> MONITORING EQUIPMENT(Required) <br /> 3. M THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01(2005) <br /> 4- ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "IIA.NDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION' <br /> 7. [1 SWRC8 PUBLICATION:"WIrEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99.❑ OTHER(Specify):_— ra` <br /> Perwimel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties ud can access those documents when needed. <br /> By January 1,2005 this facility will have a"Designated UST Operator'who has passed the operator exam administered by the International Code Council(ICC). By <br /> January 1,2005,and annually rhercaRer,the "Designated UST Operator"will train facility employees in the proper openi6on and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> Y The facility employee's role with regard to the leak detection equipment. <br /> Y The facility employee's role with regard to spills and overfills. <br /> Y Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January I,2005,the initial training will be conducted within 30 days of the date of hire_ <br /> IX COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include arty additional UST system monitoring-related information(e.g.,additional information required by your local agency): V wfas <br /> TANK OVER FILL PREVENTION: FLAPER VALVE SHUT OFF FLOW AT 90% CAPACITY <br /> AUBILE ALARM <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF 1/1/05,THE"DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III Of TI4E CURRENT UST OPERATING PERMIT APP1,rCATION— <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WrrH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATI :1 cern that the information provided herein is true and accurate to the best of my scowled - <br /> OWNE Pt7 O 51GN TURFiP $�IJIN�i -7 <br /> DATE: M91. <br /> �^ er MW. f�j� <br /> `—� ❑Operator <br /> OWNEWOPERATOR NAME(print): M'I O W NEP/OPERATOR TITLE' l 3 <br /> (Agency Use Only) This plan has been reviewed and: Approved ❑Approved With Conditions ❑Disapproved <br /> Laval Agency Signature: Duce: I'I1 10-7 <br /> Comments/Special Conditions: <br /> SJJCCI`lD-d(07/03)•3/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.