My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1998 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:09:00 PM
Creation date
12/26/2019 3:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2010
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/.30/2007 08:01 FAX 2008 <br /> SAN JOA COUNTY ENVIRONMENTAL HEALY116PARTWNT <br /> ' UNDERGROM STORAGE TANK <br /> RESPONSE PLAN--PAGE 1 (One form per factory) <br /> TYPE OF ACTION El 1.NEW PLAN ® 2.CHANGE OF INFORMATION ROL <br /> FACILITY ID# (Ag�rcy Usc Only) <br /> FACILITY NAME <br /> R01. <br /> FACILITY SITE ADDRESS R03. CITY Roa <br /> a <br /> I � � <br /> "pla-ns unauthol•ized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(c-g-,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remainins hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a r mo consistent with the ability of the secondary containment system to <br /> contain the hazardous material,butnot greater than 30 calendar days,or sooner if required by the local agency. Recovered hvardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> 7 Absorbent material will be used to contain and clean up manageable spills ofhazardous materials- Absorbent material may be reused until it becomes too saturated <br /> to be effective- It will then be managed properly-Used absorbent material,reusable or waste,will be stored in a properly labeled and scaled cgntainer. <br /> ➢ Facility,personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material_ If the water is contaminated,it will be managed as hazardous waste- if the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer n-ay not necessarily display rainbow colors- Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to Storm water Systems. <br /> A We will review secondary containment systems for possible dotcrioration if any of the following conditions occur: <br /> 1, Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2- Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> rrIcased product/waste,and the added material or resulting material from such a combination is not eompabble with secondary containment <br /> PPIZIODIC MAINTENANCE=Spill controI and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PIJRMANTtNTLY ON-SITE,BUT AVAILABLE FOR USE II=NEEDED: (Complete only if applicable <br /> EQUIPMF,NT LOCATION AVAILABILI y <br /> RIO. R2o. <br /> Mo. <br /> e a — <br /> Rin. R2 r. <br /> R31, <br /> R12. R2z <br /> Ria. <br /> R33. R23. <br /> ]z33, <br /> R14. meq. <br /> 04.R15. R25. <br /> R75, <br /> TRE FOLLOWING PERSON(S)IS/ARE RESPONSIELF,FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rao. TITLE Rso. <br /> 14 PSC' <br /> NAME RAL TITLE <br /> C 3 T T t-1 <br /> NAME Rol, TITLE Raz <br /> LL_ S iA <br /> ksk <br /> NAME R43. TITLE Ras. <br /> This intomlation is required only when rhe presence of the hazardous substance can not be de ed dileclly by the monitoring method used(ag„where liquid levet <br /> mcasurcmem,in a tank annular space or secondary piping ora used as the basis for leak determrnation). <br /> T14F FOLLOWING STEPS WILL BL TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HA7.ARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSMUE UNAUTI-IOR1ZED RELEASE: W IL.t-- Cp_C_ S h"TCa�1 SEK (C Rao <br /> s-CATlorj o R A t=FOK DO 7`es7- <br /> SJCEIID-e(06/03)-1/3 06/25/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.