Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2 <br /> TYPE OF ACTION IN 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE DO 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I1,AGILITY,INFO tMATTON <br /> FACILITY M#(Agency Use Only) 1. <br /> BUSINESS NAME(Same as Facility Name or DBA) 3, <br /> Std C�'( n fl Q e G b y <br /> BUSINESS SITE ADDRESS103. CITY 104. <br /> I G L •h vn <br /> QUFIV�EN,T TE `ITG A I!iI)PRIIVETVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the Nuipinctit manufacturers'instructions or annually,whichever is more fmqueuent Such work must be performed by qualified personnel.[23cCR¢zb32,263.4_263x,26441 <br /> MONITORING EpQ�UIPMENT IS SERVICED L ANNUALLY ❑ 99.OTHERS 490-3a <br /> •K ( I��')� 490-36. <br /> IOOA''JONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR J7632.26341 4904. <br /> r <br /> (check all <br /> all <br /> IVB SIA K M0�1T1� I Lr'�& ERFORIYYEb USING,TflE FOLLOWINGMFT IOD(S) r>,ara 1 <br /> AV 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5 <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 cat f2632,2634] <br /> SECONDARY CONTAINMENT IS: ® e.DRY [Ib.LIQUID FILLED ❑ c.PRESSURIZED ❑ d-UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER Z n co n '90'. MODEL#: T S" I(3(30 �'F' 490-8. <br /> LEAK SENSOR MANUFACTURER: -Z11 CO n - 490-9. MODEL#(S): Irl V 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR;26431 49011. <br /> l <br /> PANEL MANUFACTURER 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490'14' MODEL#(S): 490.15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> 49D-17. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): <br /> PROGRAMMED TESTS: ❑ a 0.1 g.p.h. Elb.0.2 g.p.h. ❑ c.OTHER(Specify): 4904-19.x. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR¢2646.11 490-20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR¢26451 TESTING PERIOD: I--] a.36 HOURS El b.b.60 HOURS 490-22. <br /> 90 ' <br /> ® 5.TANK INTEGRITY TESTING PER[23 cert 02643.11 490-23. <br /> TEST FREQUENCY: a.ANNUALLY [Ib.BIENNIALLY ❑ c.OTHERS 490-24._ 490.25. <br /> 99.OTHER S i s 0 h L = q-C d 490.n 26. <br /> 1J`�rPI$FE VIO I'TO iG Y$pfd Vts ri'I + xQLt.OVi'IlvG 1V1 'SODM :'ha ap i j <br /> 14 1.CONTINUOUS MONITORING OF PIPFIPIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-21. <br /> 1'cc' SECONDARY CONTAINMENT IS: IX a.DRY Elb.LIQUID FILLED C1c.PRESSURIZED [71d.UNDER VACUUM 490-29. <br /> ¢2636) <br /> PANEL MANUFACTURER: _ �r)CO n 490-30 MODEL#: T5'I 00b a+ Q 49o-3 1. <br /> LEAK SENSOR MANUFACTURER Z 0 C O Q 49032. MODEL#(S): TSP L4L S 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. X a YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a_YES ❑ b.NO 49D-31- <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 gp.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.123 CCR¢26361 <br /> 490-37. X10 F y 1' 490-38. <br /> _ MILD MANUFACTURER(S)' Ij,eD '�'gC K E`C MODEL#(S):E 1 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 gp.h LEAK TESTS.123 CCR¢26361 490 39. <br /> ELLD MANUFACTURER(S): 4900 MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑ b.NO 49041. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. _ ❑ a.YES ❑ b.NO '9044- <br /> 49045. <br /> ® 4.PIPE INTEGRITY TESTING. <br /> 49046. <br /> TEST FREQUENCY: I@ a ANNUALLY ❑ b.EVERY 3 YEARS_ ❑ c OTHER(Specify) _49047_ <br /> 49048. <br /> ® 5.VISUAL PIPE MONITORING. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ® c.MIN.MONTHLY do EACH TIME SYSTEM OPERATED' 49049. <br /> •Aibwed(a rnatiWri of imburic6 cawtRcnry 1{menrer tool oiolog_odv xr HSC 6252E <br /> ----'-. 490-50. <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR¢2636(,)(3)1 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490.51. <br /> 490-52. <br /> ❑ 99.OTHER(Specify) 490.53. <br /> UPCF UST-D(12/2007)-114 www.uWdocs.org <br /> £10/9000 XVJ EO :TT 11HS 600Z/60/90 <br />