Laserfiche WebLink
-- <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 2 of 2 <br /> he all <br /> �, I �'Y4'4 P est ri 1'' Tk�r n t M=1 4�•r,, <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490.54x. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b. <br /> LEAK MONITOR MANUFACTURER 111 Co n 490-55. MODEL#:TS IOOo a-P 490-56. <br /> LEAK SENSOR MANUFACTURER: T ne O 1) 490.57. MODEL#(S):_ T3 P' t{l S 490.58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a YES ❑ b.NO 490'59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑ b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUT-DOWN. JN a.YES ❑ b.NO 490-61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT TIIE DISPENSER ❑ a.YES 01 b.NO 490-62- <br /> UDC CONSTRUCTION IS: 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WA 13.: 490-64.. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 49064b. <br /> _ODT0WfEM TESTING <br /> ❑ i.ELD TESTING. THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> E MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 126u.11 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. �y 490-67. <br /> VItI ' i.G'bE$I1�iG <br /> The following monitoring/maintenance records are kept for this facility: 49x68. <br /> ® a.ALARM LOGS ® b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ffiJ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.E UIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> T .. <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69� <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ®THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) OM91, <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490.69.. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49069d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69, <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49m9f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ S WRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49069g, <br /> r� 49069h. <br /> W OTHER(SpeLify): 49069i. <br /> This facility has a"Designated UST Operator"who has passed the Califbmia UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The `Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as speed in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring a]arms. <br /> ^GU 1��'S/.ADMIT O�IZ.�`FI2�i�A`TxON _ <br /> Pro ide additional comments here or indicate how many es with additional information on specific monitoring procedures are attached to this plan. 490-71. <br /> a Q VR IM Sl, o T T0� tin rofl cT LL 6 <br /> E'IQNP( <br /> IBM <br /> The <br /> The UST Owner/Operator is responsible for ensuring that:1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2. all conditions that indicate a possible release are investigated;and 3.)all monitoring records are maintained_ fly. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: �....:as 490-72. ')-)'I'I�E: 490-73. <br /> NAME: 19x74. TITLE: 490-75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow- action. <br /> CERTIFICATION:I certify that the information rovided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE / DATE: 490-n. <br /> REPRESENTING: 1.Tank Owsr root aol" Owne ntor 3.Authaired R hive orOwxcr 490.76. `f <br /> APPLICANT NAME(print): 490-711. APPLICANT TITLE: 490.79. <br /> Gl/ ST it c <br /> UPCF UST-D(12/1007)-3/4 www.widoes.org <br /> £T0 80012 Xdd 90 :TT OHS 600Z/60/90 <br />