Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> SA-01-86 <br /> Vieira <br /> Site Approval Application No. SA-01-86 was approved by the San Joaquin County Community <br /> Development Department on January 11, 2002. The effective date of approval is January 21, 2002. <br /> This approval will expire on July 23, 2003, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified,all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact:Jennifer Jolley,468-3161) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage,driveway access details(including gates), on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST" for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the construction of a liquefied natural gas production facility <br /> as shown on the Plan dated January 2, 2002(Use Type: Utility Services: Major). <br /> c. STORM DRAINAGE: Storm water drainage shall be retained on the site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. (Development Title Section 9- <br /> 1135) <br /> d. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided where <br /> necessary to protect adjacent structures or properties(Development Title Section 9-1015.5[e]). <br /> e. LOADING: One (1) loading space shall be provided. The space shall be a minimum of 25 feet in <br /> length and 15 feet in width and shall have a minimum height clearance of 14 feet. On-site driveways <br /> and maneuvering areas may be used in lieu of the loading space as long as maneuvering areas for <br /> delivery vehicles are provided.(Development Title Section 9-1015.6) <br /> f. LIGHTING: Lighting shall be provided and comply with the following: <br /> is to be used at night, parking lot and security lighting shall be installed. <br /> (1) If the parking area 9 . P 9 tY 9 <br /> (Development Title Section 9-1015.5[g]) <br /> Conditions of Approval - 1 - SA-01-86 <br />