Wildwood LNG Demonstration Facility <br /> 50 ppmv NO,, at 15% Oz <br /> 4,000 ppmv CO at 15% 02 <br /> 250 ppmv non-methane hydrocarbons (NNMC) at 15% 02 <br /> An application for a BACT air permit has been sent to SJVAPCD and is being processed. <br /> According to SJVAPCD staff the processing time for reviewing permit applications is about six <br /> weeks. <br /> In addition to air emissions resulting from the process itself, attention will be given to the <br /> potential for dust that could be generated during construction or as part of the LNG truck traffic <br /> to and from the site. <br /> 9. CONSTRUCTION PERMITTING <br /> Following the successful completion of the environmental permitting process and site approval <br /> by the San Joaquin County Community Development Department, final construction drawings <br /> will be submitted to the San Joaquin Community Development Department, Building and Safety <br /> subsection for review and issuance of the appropriate structural, civil, and electrical construction <br /> permits. This may include a site walk by the department representatives and a plan check of the <br /> required documents. In addition, the plan check review process will necessarily involve the local <br /> fire authority to ensure that all applicable fire codes have been adhered to. <br /> Encroachment permits for the gas pipeline undercrossirg of Wildwood Road as well as the <br /> project access driveway aprons will be obtained from the San Joaquin County Department of <br /> Public Works. <br /> 10. PROJECT SCHEDULE <br /> The site approval and air permitting will begin immediately. It is anticipated that the site <br /> approval process review may take from 30 to 45 days. The air permit expected within a similar <br /> time period. Project discipline drawings will be submitted for plan check and construction <br /> permits so as to receive final approval to start constniction coincident with the receipt of <br /> environmental (air) permit application approval. Similarly, encroachment permits will also be <br /> obtained within this time. The fabrication of equipment is nearly completed and delivery to the <br /> site will be made as soon as practical. Once the permitting process is complete, it is expected <br /> that a 5-week construction period will be required to develop the site. Operation of the facility <br /> will begin as soon as construction, commissioning, and start-up activities are complete. <br /> AES Construction Group <br /> Page 18 <br />