My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005344 ENG DES PLN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
4620
>
2600 - Land Use Program
>
PA-0500531
>
SU0005344 ENG DES PLN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 5:18:25 PM
Creation date
12/27/2019 8:23:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
ENG DES PLN
RECORD_ID
SU0005344
PE
2627
FACILITY_NAME
PA-0500531
STREET_NUMBER
4620
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
APN
01709002
ENTERED_DATE
8/26/2005 12:00:00 AM
SITE_LOCATION
4620 E WOODBRIDGE RD
RECEIVED_DATE
8/26/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\W\WOODBRIDGE\4620\PA-0500531_PA-0300206\SU0005344\ENG DES PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• IX-FLOW The XIGATM Concept and Operation Manual <br /> During the CEB it is important that the first backwash without the chemicals will remove most of the foulant prior to <br /> the backwash with added chemicals. In this way the chemicals are exposed only on the -hard to remove-foulant. It <br /> is also important that the whole vessel is filled with chemicals, in the correct amount and with the correct soaking <br /> time. After soaking it is important to flush all the chemicals out with a backwash and, as mentioned in the <br /> backwash procedure, the TMP during CEB may not exceed 3 bar with a flux rate of 250-300 I/M2h. <br /> The chemicals to be used in the CEB depend on the type of foulant to be expected from the feed water. e.g. <br /> HCL/H202 (pH=2/200 ppm) in a sandfilter backwash water from a ground water source application containing <br /> mainly ironhydroxide and manganeseoxide. Or e.g. NaOCI (100 ppm) in a pre-treated surface water application. <br /> Chemical Cleaninq <br /> If despite all preventative measurements (Backwash and Chemically Enhanced Backwash) the TMP rises above 1 <br /> bar then additional Chemical Cleaning with different chemicals is recommended. Also for disinfectants it is <br /> recommended that e.g. once every month the system is cleaned with a different disinfectant as used in the CEB. <br /> The most effective chemicals to be used in this additional Chemical Cleaning depend on the type of foulant in the <br /> feed water and the chemicals used in the standard CEB. <br /> Example 1: The chemical used in CEB is HCL/H2O2 and the foulant is mainly biological growth. A chemical <br /> cleaning via the backwash using 500 ppm NaOCI can be performed in 3-4 sequences with a soaking time of 15 <br /> minutes each time. <br /> Example 2: The chemical used in CEB is NaOCI and the foulant is mainly metal salts. An overnight soaking in HCI <br /> (pH=2) or 1% citric acid could be considered. <br /> CEB <br /> i�r�an <br /> Ame <br /> \t exreh{nm t1AP <br /> E <br /> d <br /> rrpn.rai�anny <br /> time <br /> CAPF-XIGA-0143 <br />
The URL can be used to link to this page
Your browser does not support the video tag.