My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005344 ENG DES PLN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
4620
>
2600 - Land Use Program
>
PA-0500531
>
SU0005344 ENG DES PLN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 5:18:25 PM
Creation date
12/27/2019 8:23:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
ENG DES PLN
RECORD_ID
SU0005344
PE
2627
FACILITY_NAME
PA-0500531
STREET_NUMBER
4620
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
APN
01709002
ENTERED_DATE
8/26/2005 12:00:00 AM
SITE_LOCATION
4620 E WOODBRIDGE RD
RECEIVED_DATE
8/26/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\W\WOODBRIDGE\4620\PA-0500531_PA-0300206\SU0005344\ENG DES PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The XIGAT'" Concept and Operation Manual <br /> -1-1X- FLOW <br /> Loading membrane elements <br /> Installing XIGATm elements in a pressure vessel should be done by two +� <br /> people. The items required for the installment of membrane elements in <br /> for example a 6m pressure vessel are: 4 membrane elements, 3 <br /> interconnectors, 2 end-connectors, 16 0-rings [35.00x4.00 mm], and <br /> some fill-rings. <br /> First read the instructions of the membrane housing manufacturer - <br /> carefully on how to open and close the end-caps of the membrane `` <br /> housing. Lubricate the 0-rings with glycerine (purity > 99.7% glycerine) <br /> and place them on the connectors. Avoid damages to the element at all <br /> times. Note the element serial number engraved on the PVC shell. 1 ♦ <br /> Gently push the connectors into the central permeate tube of the IL <br /> membrane elements. Make sure the 0-rings are not displaced. Remove <br /> the end-cap(s) of the pressure vessel. <br /> Push the membrane element(with an end-connector) halfway into the <br /> membrane housing. The next element should be fitted with an <br /> interconnector and is connected to the first by pushing the <br /> interconnector into the central tube of the first element. Hold the first <br /> element firmly when doing this. Make sure the 0-rings are not <br /> displaced. Push the second element also only half-way into the <br /> membrane housing. <br /> i <br /> Repeat this procedure until the last element is pushed half-way into the <br /> membrane housing. Do not pull the installed elements as the wrings of <br /> the inter-connectors might be displaced. If absolutely necessary remove <br /> the elements by pushing them from the other side of the membrane <br /> housing. Make sure that the serial numbers of all the elements in the <br /> membrane housing are on the same side. - <br /> q i <br /> Lubricate the 0-rings with glycerine and place them on the end- + T <br /> connectors. Push the end-connector gently into the central permeate <br /> tube of the membrane element and make sure the 0-rings are not <br /> displaced. When all membrane elements are inside the membrane <br /> housing the end-caps should be bolted. Any play between end-cap and <br /> end-connector is filled with fill-rings. <br /> CAPF-XIGA-0143 <br />
The URL can be used to link to this page
Your browser does not support the video tag.