Laserfiche WebLink
Hazardous Waste Tank System RECT JUL 2 0 2015 August <br /> 1 Written Assessment per CCR Title 22 <br /> Applied Aerospace Structures; Inc.. Stockton, CA 95206 <br /> 2014 <br /> AASC Clea��ing Center Pit <br /> II. Bi-Weekly: <br /> - Inspections: <br /> �T This inspection will take place on every other Friday's <br /> { (except holidays &designated plant shutdowns)and will <br /> be in addition to the daily inspection tasks. <br /> r <br /> j' 1. Check floor coating for signs of cracks;or peeling that <br /> would allow liquid to penetrate the protective barrier. <br /> 2. Check sump for dirt/debris accumulation_Lift floor <br /> grating where necessary to view all sections. <br /> 3_ Check anchoring snugness ofpH treatment tank and <br /> as so ciated parts to ensure they are secure_ <br /> Corrective Actions.- <br /> 1. <br /> ctions:1. If cracks are observed;notify maintenance supervisor <br /> and Lon Kitagawa immediately and arrangements will <br /> be made to repair coating_ <br /> 2_ Sweep out dry debris;orvacuum wet debris and <br /> appropriately dispose as hazardous waste_ <br /> 3_ Use appropriate tools to tighten loose hardware_ <br /> ENVIRON IENTAL DEPARTMENT <br /> Strandberg Associates 9(866) 388-0404 rwatercL1V(@rwaterquy.com A-6 <br />