Laserfiche WebLink
WN1181 Quarry Lane <br /> Building 300 <br /> Pleasanton, CA 94566 <br /> (510) 462-4000 <br /> ,51, 112-6283FAX <br /> & Associates <br /> July 29, 1994 BSK Job No- P92219 3 <br /> Mr Frank Yoneshige <br /> Van Den Bergh Foods Company <br /> 1400 Waterloo Road <br /> P O Box 9200 <br /> Stockton, CA 95208 57 <br /> Subject Quarterly Groundwater Monitoring <br /> Van Den Bergh Foods <br /> Stockton Facility <br /> Dear Mr Yoneshige <br />' BSK & Associates, Inc (BSK) is pleased to submit this report which summarizes quarterly <br /> groundwater sampling and analysis performed at the subject Van Den Bergh Foods facility. The <br /> two copies of this report should be submitted under a Van Den Bergh Foods cover letter to Ms. <br /> Mary Meays at the San Joaquin Department of Health Services <br /> BACKGROUND <br /> BSK &Associates, Inc (BSK) understands that a 1000-gallon gasoline tank, a 550-gallon solvent <br /> tank, and a 520-gallon diesel tank were removed from a common excavation on June 26, 1986. <br /> Analytical results of soil boring R-1 (Stauffer, April 1987) drilled to a depth of 30 feet indicated <br />' diesel concentrations ranging from 14,000 ppm to 61,000 ppm and aromatic volatile <br /> concentrations ranging from I ppm Benzene to 22 ppm Xylenes at depths from 15 feet to 30 feet. <br /> Chlorinated hydrocarbons were not detected in R-I No contamination was detected in soil <br />' borings R-2 or R-3, located approximately 10 feet northeast and northwest from the excavated <br /> area <br />' Results of a groundwater investigation conducted by Roy F Weston in October 1988 indicated <br /> no diesel fuel components detectable in soil or water samples collected during installation and <br /> sampling of three monitoring wells located approximately 75 feet east, 100 feet northwest and <br />' 100 feet south of the former tanks emplacement The monitoring wells were installed to a depth <br /> of approximately 65 feet. On December 16, 1993 the depth to groundwater was measured in <br /> MW-1 by BSK personnel The groundwater was observed to be at a depth greater than 65 feet. <br />' In October of 1992 BSK drilled and sampled two soil borings; one boring in the former tank <br /> i <br /> excavation, and one boring approximately ten feet north of the excavation (the latter was <br />' completed as a groundwater monitoring well) The results of the soil samples analyzed indicate <br /> that petroleum hydrocarbons were detected to a depth of 70 feet in the soil boring completed in <br /> the former tank excavation and to a depth of 60 feet in the soil boring completed ten feet north <br /> of the excavation Refer to BSK/Remediation Services, Soil and Groundwater Investigation <br /> Geotechnical Engineering - Engineering Geology •Environmental Services• Construction Inspection &Testing -Analytical Testing <br />