My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008921
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
1400
>
3500 - Local Oversight Program
>
PR0545129
>
ARCHIVED REPORTS_XR0008921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:26:14 PM
Creation date
1/7/2020 8:58:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008921
RECORD_ID
PR0545129
PE
3528
FACILITY_ID
FA0006171
FACILITY_NAME
Mizkan America, Inc.
STREET_NUMBER
1400
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205-3743
APN
14115002
CURRENT_STATUS
02
SITE_LOCATION
1400 E WATERLOO RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' • Notify the HS Department when field work lasts more than six months so that <br /> the HASP can be reviewed and updated as needed <br /> • Immediately notify the HS Department upon receiving notice of any OSHA <br /> inspection <br /> • Ensure that the project files receive copies of <br /> t - all internal and external HS correspondence <br /> - all au sampling records (including "none-detected") <br /> - all accident reports and Accident Review Board documentation <br /> 1 - documentation of audits and corrective actions <br /> - air monitoring equipment calibration records <br />' - all FADLs <br /> The PM will lead at least one site safety audit team per quarter while field activities are in <br /> progress for,lobs lasting at least a week in duration and will ensure that all accidents, <br /> mcidents and/or near-misses are investigated in a timely manner The PM will ensure that <br />' management performs an investigation of all incidents or accidents which had the potential to <br /> cause a lost-tune or hospitalization incident or fatality within 24 hours of the incident <br /> The Project Manager for this work is Sydney Geels <br /> 2.3 Project Health and Safety Representative <br /> The Project HS Representative is responsible for the preparation and modification (as <br /> necessary) of this HASP The Project HS Representative will approve changes and update the <br /> HASP as warranted by altered site conditions and shall have the only authorization to effect <br /> such changes (except those changes outlined in Section 12 0) The Project HS Representative <br /> will advise the PM on health and safety issues which may have an unpact on project <br /> operations. In addition, responsibility of the Project HS Representative includes <br /> • General health and safety program administration <br />' • Provide technical assistance to the PM and the Project Field Coordinator. <br />' • Investigate significant accidents, illnesses and near-misses Recommend <br /> corrective actions as appropriate. Review all Accident/Incident Investigation <br /> Reports <br /> 1 <br />' MWI1-29-94/RHS/HASP/94-0037 JAF 2-3 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.