My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008921
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
1400
>
3500 - Local Oversight Program
>
PR0545129
>
ARCHIVED REPORTS_XR0008921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:26:14 PM
Creation date
1/7/2020 8:58:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008921
RECORD_ID
PR0545129
PE
3528
FACILITY_ID
FA0006171
FACILITY_NAME
Mizkan America, Inc.
STREET_NUMBER
1400
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205-3743
APN
14115002
CURRENT_STATUS
02
SITE_LOCATION
1400 E WATERLOO RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Determine required personalrotective equipment <br /> Pfor each work area <br /> • Assist Field Coordinator in establishing decontamination area locations <br /> • Evaluate and approve contractors regarding health and safety compliance both <br /> ' prior to accepting the contract and upon completion of the project, as <br /> appropriate <br /> • Conduct exposure monitoring as necessary to determine type and extent of <br /> personnel exposure and to assess the appropriateness of protective measures <br /> The Project Health and Safety Representative is Jo Forchione. <br /> ' 2.4 Project Field Coordinator <br /> The Project Field Coordinator (FC) reports to the PM and is responsible for field <br />' implementation of the HASP This includes communicating project health and safety <br /> requirements to all on-site project personnel, field supervision, consultation with the Project <br />' HS Representative regarding changes to the HASP and conducting monthly health and safety <br /> inspections (should the project exceed six weeks duration) The Project FC is responsible for <br /> informing the Project HS Representative and the PM of any changes to the workplan, prior to <br /> implementation, so that health and safetyissues introduced by those changes may be properly <br /> addressed The Project FC will be on-site during all project related activities or will delegate <br /> his responsibilities to qualified supervisory personnel (i e , person(s) having 8-hours of <br /> supervisory training in addition to the OSHA 40-hour 29 CFR 1910 120 training), as <br />' appropriate. <br /> Other responsibilities include <br /> • Reading and being familiar with the Project HASP, as well as appropriate IT <br /> Policies and Procedures ' <br /> C Stopping work as required to ensure personnel safety and protection of property, <br />' or where life or property threatening noncompliance with safety requirements are <br /> found <br />' • Monitoring the use of required protective clothing and safe work practices. <br />' ! Determining and posting routes to capable medical facilities and emergency <br /> telephone numbers (including poison control facilities), and arranging emergency <br />' M7/11-29-94/RHS/HASP/94-W37JAF 2-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.