My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008921
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
1400
>
3500 - Local Oversight Program
>
PR0545129
>
ARCHIVED REPORTS_XR0008921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:26:14 PM
Creation date
1/7/2020 8:58:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008921
RECORD_ID
PR0545129
PE
3528
FACILITY_ID
FA0006171
FACILITY_NAME
Mizkan America, Inc.
STREET_NUMBER
1400
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205-3743
APN
14115002
CURRENT_STATUS
02
SITE_LOCATION
1400 E WATERLOO RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transportation to medical facilities <br /> • Notifying local public emergency officers of the nature of the operations, and <br /> posting their telephone numbers in an appropriate location <br /> - Conducting and documenting required project specific training <br /> • Observing project personnel for signs of chemical or physical trauma <br /> Conducting job site safety audits at Ieast weekly and documenting these audits <br /> on Field Activity Daily Log (FADL) forms. <br /> Ensuring that all personnel have been given the proper medical clearance, have <br /> ' met appropriate training requirements, and have the appropriate documentation <br /> posted in the work area <br /> • Monitoring project personnel to ensure compliance with the HASP <br /> • Establishing Work Zones as appropriate <br /> ' • Presenting tailgate safety meetings and maintaining attendance records <br /> • Monitoring to ensure that decontamination procedures are meeting established <br /> criteria <br /> • Responding to employee's/contractor's health and safety concerns. <br /> • Periodically audrtmg subcontractor qualifications to ensure that only properly <br />' qualified personnel are allowed in the work area <br />' The Project Field Coordinator is Linus Fanas <br /> 2.5 On-Site Health and Safety Coordinator <br /> The Project FC will also serve as the On-Site Health and Safety Coordinator duringthis work <br /> Thus, he will be responsible for ensuring complete compliance with the HASP by all <br />' personnel on site. He may not, however, authorize changes to or variances from the HASP. <br /> Any modification of project safety requirements must be approved by the Health and Safety <br />' Representative <br />' M7/11-29-94/RHs/HASP/94-0037IAF 2-5 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.