My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2941
>
2200 - Hazardous Waste Program
>
PR0513950
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 10:49:01 AM
Creation date
1/7/2020 9:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513950
PE
2247
FACILITY_ID
FA0009657
FACILITY_NAME
NUSTAR TERMINALS OPERATIONS PARTNERSHIP LP
STREET_NUMBER
2941
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206-1149
APN
48906-1
CURRENT_STATUS
01
SITE_LOCATION
2941 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
upgraded. <br />• The truck driver needs to be locked out of the terminal for an <br />appropriate period of time. <br />Corrective/Investigative Actions <br />• Action Von Crites. Lock out the driver for seven days. Do not allow the <br />truck to return to the terminal until the carrier certifies that the overfill <br />sensors have been certified to be operating. Do not allow driver to load <br />at the terminal until he has received additional training on truck rack <br />equipment and procedures. Due date: 28 July 2006 <br />• Action Von Crites. Prepare a letter to the carrier that describes actions <br />to be taken and requesting their plan to provide: <br />- certification that truck overfill sensor systems are maintained <br />and are tested; and <br />- driver training to ensure drivers check for retain prior to <br />loading. <br />Follow-up these actions at a meeting with the carrier to ensure Bartlett <br />has a plan to meet Valero LP procedures and standards. Due date: <br />29 July 2006. <br />• Action Von Crites. Use this incident for a "lessons learned" discussion <br />during an upcoming terminal safety meeting. Due date: 15 July 2006. <br />Investigated By: Shawn Mendoza, Richard Brandes, Sue Johnson <br />Submitted By: <br />Attachments: <br />Approvals: <br />Mike Peterson <br />Mike Burgett <br />Richard Brandes <br />none <br />Date <br />Date <br />45962 incident investigation report final 7/19/2006 <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.