Laserfiche WebLink
Geological recicnieslnc. <br /> Soil&Groundwater W.P. Page 4 <br /> Project No. 989.2 <br /> March 29,2004 <br /> 3.0 SCHEDULE & REPORTING <br /> 5 <br /> Geological Technics Inc. anticipates beginning fieldwork no later than,45 days after work <br /> plan approval and issuance of the applicable permits. The information gathered during this <br /> phase of work will be presented in a report, which will include a summary of the geology as <br /> well as the results of sample analyses. The project will be supervised by,Dr. Ray Kablanow, <br /> a registered professional geologist. Copies of the report will be forwarded to both the <br /> appropriate County and State regulatory agencies (SODER and CRWQCB). <br /> 4.0 SIGNATURE & CERTIFICATION <br /> This project will be perrformed by Geological Technics Inc. in accordance with accepted <br /> geologic and hydrologic standards of the State of California acce ted and in effect at the <br /> p <br /> time of this investigation. Geological Technics Inc. is not responsible for undisclosed <br /> conditions. <br /> This work plan was prepared by: <br /> Eric L. Price p�E5S�0 <br /> Geologist �R <br /> R.I.KABa AN0►N N <br /> N0.5234 <br /> Raynold I. Kablanow II, Ph.D. <br /> California <br /> istered <br /> CertifiedHydrogeologist#44tist#5234 <br /> 2 OF CAttFO�`�\P <br /> I <br /> Registered Environmental Assessor II #89 <br /> ii <br />