Laserfiche WebLink
k <br /> Cgotogiral reChnks kc. Page 2 <br /> Valley Wholesale Drug <br /> Project No.: 989.2 <br /> March 26,2002 <br /> August 25, 1998 — Three soil/water GeoProbes (GP-1, GP-2 & GP-3) were placed along the <br /> south side of the building in an attempt to better define the limits of the soil and groundwater <br /> plume. <br /> August 15, 2000 — Three additional groundwater monitoring wells (MW-4, MW-5 & MW-6) <br /> were installed along the east side of the building in an attempt to better define the lateral limits <br /> of the groundwater plume. <br /> November 21, 2001 —A work plan for monitoring well installation was submitted to SJC-EHD. <br /> February 27, 2002 — The work plan was approved for the installation of three (3) shallow <br /> monitoring wells. <br /> Proposed Direction of Project <br /> To further investigate the lateral extent of soil and groundwater impacted with gasoline range <br /> petroleum hydrocarbons, Geological Technics Inc. proposes the installation of three (3) shallow <br /> monitoring wells. <br /> 1. Monitoring well installation. <br /> • Install three (3) shallow monitoring wells to a depth of 20-feet bgs. Log boreholes <br /> based on 5 foot coring interval soil sample collection. <br /> • Install one (1) deep monitoring well to a depth of 40-feet bgs. Log boreholes based on 5 <br /> foot coring interval soil sample collection. <br /> • Submit up to two (2) soil samples from each of the monitoring wells to a laboratory for <br /> analysis. Soil samples will be tested for: <br /> ❑ BTEX (EPA method 8020) <br /> ❑ TPH-Gasoline (EPA method 503018015m) <br /> ❑ Oxygenates (5), 1,2 DCA and EDB (EPA method 8260) <br /> • Develop the four new wells. <br /> • Survey the top of casing of existing and new wells as required under AB2886. <br /> • Prepare and submit a site characterization report on the installation of the four (4) new <br /> monitoring wells. <br /> 2. Perform groundwater monitoring. <br /> • Purge and sample the ten (10) monitoring wells on a quarterly basis for one year. <br /> • Submit the groundwater samples from one event to Sherwood labs for: <br /> ❑ BTEX, TPH-G (EPA 602 & 8015) and the five oxygenates, 1,2 DCA and EDB (EPA <br /> 8260) <br /> • Submit the groundwater samples from the other three events to Sherwood labs for: <br /> ❑ BTEX, MTBE and TPH-G (EPA 602 & 8015) <br /> Prior to installation of the monitoring wells it will be necessary to obtain access agreements <br /> from the property owners. This work will be performed by GTI on a time and materials basis. <br /> Proposed Bidding of Project <br /> 1. To remain in compliance with the USTCFP, Geological Technics Inc. requested V&W <br /> Drilling to prepare estimates for drilling and installing the groundwater monitoring wells. <br /> We have found V&W to be very cost effective for three primary reasons: <br />