My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1401
>
3500 - Local Oversight Program
>
PR0545145
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 10:32:24 AM
Creation date
1/9/2020 10:19:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545145
PE
3528
FACILITY_ID
FA0003820
FACILITY_NAME
VALLEY WHOLESALE DRUG
STREET_NUMBER
1401
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13525031
CURRENT_STATUS
02
SITE_LOCATION
1401 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Teclucics/a. Page 3 <br /> Valley Wholesale Drug <br /> Project No.: 989.2 <br /> March 26,2002 <br /> 4 reasonable charge rate <br /> • fast drilling equipment <br /> • well trained crew <br /> 2. To remain in compliance with the USTCFP, Geological Technics Inc. requested Del Tech E <br /> Geotechnical Support Services to prepare estimates for developing the new wells and <br /> performing quarterly groundwater monitoring. We have found Del Tech Geotechnical <br /> Support to be very cost effective for three primary reasons: <br /> • reasonable charge rate <br /> + reliable field equipment <br /> • professional quality service <br /> 3. We have found that Sherwood Labs, Hilmar, CA to be both cost effective and currently in <br /> compliance with AB2886 mandated electronically deliverable format requirements. <br /> A budget-spread sheet is attached and shows itemized cost for the tasks proposed. In an attempt <br /> to make this Pre-Approval.flow smoothly, we have used the same unit costs for this work that <br /> have previously been approved by the USTCFP for other projects. <br /> Geological Technics Inc. accepts field support services and lab invoices and adds a 15% <br /> overhead fee. <br /> Tentative Schedule for Implementing Work <br /> The proposed schedule for the additional site characterization work and risk evaluation study is <br /> as follows: <br /> F <br /> Task Description Completion Date <br /> • Submit Bids/Cost pre-approval to the Fund March 2002 <br /> • Receive Cost approval from the Fund April 2002 <br /> • Install the New Wells May 2002 <br /> • Submit Well Installation Report June 2002 <br /> • Perform Groundwater Monitoring May 2002 — May 2003 <br /> Thank you for your attention to this project. Call me if you have questions or need clarification <br /> call me at (209) 522-4119. <br /> i <br /> f <br /> Respectfully Submitted, <br /> .� C L = ;i <br /> C� <br /> Raynold I. Kablanow II, Ph.D. 'I <br /> cc: Paul Souva—Valley Wholesale Drug Company <br /> Jeffrey Wong— SJCEHD, Senior REHS <br /> Marty Hartzell—CRWQCB <br /> _ 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.