My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011079
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1401
>
3500 - Local Oversight Program
>
PR0545145
>
ARCHIVED REPORTS_XR0011079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:35:06 AM
Creation date
1/9/2020 10:36:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011079
RECORD_ID
PR0545145
PE
3528
FACILITY_ID
FA0003820
FACILITY_NAME
VALLEY WHOLESALE DRUG
STREET_NUMBER
1401
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13525031
CURRENT_STATUS
02
SITE_LOCATION
1401 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> f I <br /> January 3 19 5 - Wm J Hunter & Associates , (WJH, ) prepared an <br /> interim report giving details of the work, refer to that document <br /> for more details <br /> February 15 , 1995 - The San Joaquin County PHS, Environmental <br /> Health Division responded to that report, requiring additional <br /> work, a copy of that correspondence is included as EXHIBIT B <br /> The following workplan has been prepared to comply with that <br /> document <br /> WOR PLN FOR PLA N 7 IL BORINGS AT 1401 W FREMONT <br /> ST ST C TON CA & QQNVERTING THREE 3 TO GROUNDWATER <br /> MONITORING WELLS, <br /> NOTES ( 1 ) Locations of underground utilities will be identified <br /> prior to beginning work Soil borings/monitoring <br /> well locations will be clearly marked prior to mobil- <br /> izing equipment <br /> ( 2 ) All drilling & completion operations will be done <br /> under the direction of a geologist from WJH <br /> 1 Mobilize V & W Drilling Co auger rig & support truck <br /> equipped with suffficient 8" or 10 nominal size, hollow-stem <br /> augers to complete each soil boring/monitoring well without <br /> having to decontaminate equipment The tentative locations of <br /> the seven (7 ) auger holes/wells are shown on PLATE VI , final <br /> locations may vary slightly due to interference from underground <br /> utilities A drilling permit application & required fee <br /> accompanies this workplan A general health & safety plan is <br /> attached as EXHIBIT C <br /> 2 Soil samples will be taken at 5' intervals from 5 ' below <br /> grade to the capillary fringe, which is estimated to be at about <br /> 12' bgl Coring equipment will consist of either an 18" or 30" <br /> California Modified split-spoon sampler designed to hold metal <br /> tubes for obtaining soil samples At least one ( 1 ) tube will be <br /> preserved for analysis by placing teflon tape over the ends of <br /> the tube, covering with plastic caps , and sealing with duct tape <br /> Each tube will be clearly labeled & placed in a sealed chest with <br /> ace pending transfer to a State Certified laboratory for <br /> analysis <br /> 3 Drill spoils & unused core material will be place in clearly <br /> labeled, sealed metal drums & stored on location pending results <br /> of the laboratory analyzes <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.