Laserfiche WebLink
i <br /> Detailed List of Steps with Hazard Assessments and Precautions <br /> Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to,permitting, <br /> access agreements,and notification to required contacts(e.g. site managers,inspectors,clients,subcontractors,etc.). A tailgate safety meeting must be performed and documented at the beginning of <br /> each workday. Safe Performance Self Assessment(SPSA)procedures must be used throw out the project. Weather conditions(heat,cold,rain,lightning)must also be considered. <br /> O Job Steps ® Potential Hazard O Critical Actions <br /> j Clear drilling locations. Traffic hazards,overhead andReference Borehole Clearance Review form and coordinate with <br /> underground installations,product Station Manger(or designee)to minimize potential conflicts.Review <br /> releases,property damage,dealer proposed locations against available construction drawings and known <br /> utilities,ticks,product lines,etc. Mark out the proposed borehole <br /> locations. Call underground utility locating service for public line <br /> l location clearance,and get list of utilities being contacted.If <br /> necessary,coordinate private line locator for private ro <br /> j Mobilize with proper equipment/supplies for drilling. Vehicle accident. Lifting hazards. Delay Follow safe driving procedures. Use proper lifting techniquesVerify <br /> I or improper performance of work due to that subcontractors are aware of their responsibilities for labor., <br /> improper equipment onsite. equipment and supplies. Review HSP and permit conditions,and <br /> gather necessary PPE. <br /> Visually clear proposed drilling locations. Underground and overhead Complete Pre-Mobilization section of Borehole Clearance.Review <br /> utilities/obstructions. ___10 mt and adjust drilling locations as necessary. _ <br /> Set up necessary traffic control. - - - - Struck by vehicle during placement. Use buddy system for placing traffic control. Reference traffic control <br /> Vehicle accident as a result of improper plan section of HSP(may include specific requirements based on <br /> traffic control equipment lacement. permits). <br /> Assist with set up of drill rig. Vehicle accident during rig movement. Verify clear pathway to drilling location and clearance for raising <br /> Damage caused by drill rig while mast. Provide as-needed hand signals and guidance to driver[o place <br /> accessing set-up location. Overhead rig. Visually inspect rig(fire extinguisher on board,no oil or other <br /> utilities and structures. Soft terrain. Rig fluid leaks,cabling and associated equipment in good condition, <br /> movement. pressurized hoses secured with whip-checks or adequate substitute, <br /> jacks in good condition?). If necessary,use wooden blocks under <br /> jacks to spread load. Chock wheels. <br /> Set up exclusion zone(s)and work stations(drilling and logging/sample Struck by vehicle. Slip/fall hazards. Implement exclusion zone set-up instructions of HSP. Set up work <br /> collection). _ stations with clear walking paths to and from rig. <br /> Clear upper five feet of borehole using post-hole digger or bucket.auger. Back strain,exposure to chemical Don any additional PPE and initiate air quality monitoring in <br /> hazards,hitting an underground utility, accordance with the HSP. Stand upwind to avoid exposure whenever <br /> repetitive motion. possible. Use the PID to track the airborne concentration of <br /> contaminants close to potential sources such as the core as it is being <br /> raised from the hole,the core is opened,etc. Have respirator ready <br /> with orgastic vapor cartridges on your belt,readily available. Evaluate <br /> the sample inside the baggie at arm's length. DO NOT EVALUATE <br /> THE SAMPLE IN THE OPEN THIS WILL AVOID <br /> UNNECESSARY EXPOSURE. Use proper lifting techniques and <br /> tools. Complete the Pre-Drilling section of the BoreholeClearan <br /> .._. .- .. Review form --::_ - - --:.. . _ ce <br /> _ " <br /> s; <br /> - Commence drilling borehole. Cross-contamination from previous hole. Decontaminate sampling equipment atter collecting a sample and <br /> back strain,heat or cold,eye injury, decontaminate drilling auger/rods after drilling a borehole.Use proper <br /> exposure to chemical hazards,hitting an lifting techniques. Use PPE and monitoring in accordance with HSP, <br /> underground utility, trip and fall, Monitor drilling progress. Keep work area clear of tripping or <br /> e ui men[failure,lifting hazards, sli in hazards.Perform eriodic visual inactions of drill ri . <br /> SECOR International Incorporated 11 HASP dNhng <br />