My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2900 - Site Mitigation Program
>
PR0505663
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:44:23 AM
Creation date
1/9/2020 11:30:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505663
PE
2950
FACILITY_ID
FA0006930
FACILITY_NAME
ARCO PRODUCTS CO #5450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
02
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including,but not limited to,permitting, <br /> access agreements,and notification to required contacts(e.g, site managers,inspectors,clients, subcontractors,etc.). A tailgate safety meeting must be performed and documented at the beginning of <br /> each workday. Safe Performance Self Assessment(SPSA)procedures must be used throughout the project. Weather conditions eat,cold,rain,lightning)must also be considered. <br /> O Job Steps 6 Potential HazardO Critical Actions <br /> overhead hazards _. '_ <br /> T - — <br /> Collect samples in accordance with sampling plan. Cross-contamination,improper labeling Decontaminate sampling equipment between each sampling ntn. <br /> or storage,exposure to site contaminants. Label samples in accordance with sampling plan. Keep samples <br /> f . .. stored in proper containers,at correct temperature,and away from <br /> work area. Perform air monitoring and wear titoper PPE. <br /> j Store cuttings properly in accordance with site-specific requirements. Exposure to public. Traffic hazard or Have proper storage containment and labeling available onsite. Place <br /> obstruction/inconvenience to station materials in isolated location away.from traffic and:.other site- - .--- <br /> - - - o ' ation: im ro <br /> _per storagga or drs- Co <br /> osal. functions. ordinate proffer disposal offsite where a licable . <br /> P_P — _ <br /> Commence grouting Improper grouting can lead to future Mix grout to specification and completely fill the hole. Use proper <br /> vertical conduit for contaminant lifting techniques and wear proper PPE. Keep work area clear of <br /> migration. Back strain,trip hazards,eye tripping hazards. Verify presence or other authorization by required <br /> injury from splashing or release of grout. inspectors for grouting. <br /> Unauthorized backfilling causes extra - <br /> work. _ <br /> Clean site/demobilize Traffic. Safety hazard left on site. Use buddy system as necessary to remove traffic control. Leave site <br /> Lifting hazard. clean of refuse and debris. Clearly mark/barricade any well heads that <br /> need later work or concrete curing.Notify station personnel of <br /> - departure,Map well locations,site structures,and location of drilling . <br /> wastes. Use proper lifting techniques. <br /> Package and deliver samples to lab. Bottle breakage,back strain. Handle and pack bottles carefully(bubble wrap bags are helpful).Use <br /> trope lifting techrdques. <br /> General —._ - <br /> Keep SPSA card on you at all times. Use it frequently. What can happen? What <br /> is the worst thing that can happen? Plan for it and carry out our. tan. <br /> Typical work Weather related incidents: automobile Check weather reports daily.Project will visits will not be performed <br /> accidents,slips and falls, during inclement weather. Sampling may be performed during light <br /> rain mist. Wear raincoats. Drive at speed limit or less as needed to <br /> keep safe distance from vehicle in front,avoid short stops. <br /> Typical work. Cold Stress. For temperatures below 40°F,adequate insulating clothing must be <br /> wom. If the temperature is below 20 OF,workers will be allowed to <br /> enter a heated shelter at regular intervals. Warm,sweet drinks should <br /> be available. Coffee intake should be limited. <br /> No one should begin work or return to work from a heated shelter <br /> with wet clothes. Workers should be aware of signs of cold stress, <br /> such as heavy shivering,pain in fingers or toes,drowsiness or <br /> irritability. Onset of any of these signs are indications for immediate <br /> _ return to a heated.shelter._' <br /> Heat Stress For temperatures above 75/F, each person will take their pulse at rest. <br /> At breaks,the pulse should be less than 110 beats per minute after one <br /> minute. Before returning to work, the pulse should be no more than <br /> 10 beats greater than the resting pulse. <br /> SECOR International Incorporated 12 HASP-drilling <br />
The URL can be used to link to this page
Your browser does not support the video tag.