Laserfiche WebLink
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to,permitting, <br /> access agreements, and notification to required contacts(e.g.site managers,inspectors,clients,subcontractors,etc.). A tailgate safety meeting must be performed and documented at the beginning of <br /> each workday. Safe Performance Self Assessment(SPSA)procedures must be used throughout the project. Weather conditions(heat,cold,rain,lightning)must also be considered. <br /> O Job Steps O Potential Hazard O Critical Actions <br /> If the air temperature is greater than 95/F, work should be done for <br /> 30 minutes with a rest break of 10 minutes for Level D. For Level C, <br /> work should be done for 20 minutes,with a rest break of 10 minutes. At <br /> least 8 ounces(1 cup)of cool water,Gatorade-type drink,or dilute fruit <br /> juice should be consumed at each rest break or at least one cup every 20 <br /> minutes. <br /> Work should stop if any of the following symptoms occur: muscle <br /> spasm and/or pain in the limbs or abdomen(heat cramps);weak pulse, <br /> heavy sweating, dizziness, and/or fatigue (heat exhaustion); or rapid <br /> pulse, no sweating, nausea, dizziness, and/or confusion (heat stroke). <br /> Provide First Aid immediately. <br /> Use sunscreen on unprotected skin to protect against ultraviolet <br /> exposure as necessary. <br /> No eating,drinking,or smoking on-site. �- <br /> No contact lenses on-site. <br /> No facial hair that would interfere with respirator fit. <br /> A safety meeting will be held each day,even if there is only one perswog Topics will always include the work scheduled for th <br /> onrkin <br /> e day and <br /> on the project on any given day. restatement of the hazards and means to avoid them. Other topics <br /> may include sampling in general and advances in technology and how <br /> it may be applied to the project. Use Attachment 6 for logging the <br /> topics discussed. <br /> SECOR International Incorporated 13 HASP drildng <br />