Laserfiche WebLink
Atlantic Richfield Company 4 <br /> ARCO tk5450,1617 west Fremont Street,Stockton,California <br /> November 20,2001 <br /> • Report. A report will be prepared after completion of necessary <br /> fieldwork and upon receipt of laboratory analytical results. The report <br /> will include boring logs and well construction details, a site map, soil <br /> and groundwater analytical results,chain-of-custody documentation, <br /> and findings. <br /> Field and laboratory procedures are presented as Attachment D. <br /> SCHEDULE <br /> SECOR is prepared to initiate fieldwork within 46 weeks following approval of this <br /> work plan by the SJCPHS. A project schedule is included as Figure 3. This time frame is <br /> estimated and the actual time needed may be shorter or longer. <br /> If there are any questions regarding the contents of this work plan,please call us at(916) <br /> 861-0400. <br /> Sincerely, <br /> SECOR International Incorporated <br /> QwoFESS] <br /> Thomas Y. Parker <br /> Staff Geologist <br /> X No.))C],0583�'99�'�, � <br /> * <br /> Up.!. <br /> V C< <S}q cmcOI <br /> Rusty Benkos .E. �0F CA�.�F� <br /> Project Mana <br /> Attachments: Figure 1 - Site Location Map <br /> Figure 2 - Site Map with Proposed Soil Boring Locations and Delta's <br /> 1999 Soil Analytical Results <br /> Figure 3 - Project Schedule <br /> Attachment A - SJCPHS Letter dated July 13, 2001 <br /> Attachment B - Historical Site Data <br /> Attachment C - Site Health and Safety Plan <br /> Attachment D - Field And Laboratory Procedures <br /> cc: Mr. Paul Supple,Atlantic.Richfield Company <br /> Mr. Marty Hartzell, RWQCB <br /> L•ARCW450Awarkpb=\ARCO 5450 WP <br />