My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2900 - Site Mitigation Program
>
PR0505663
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:44:23 AM
Creation date
1/9/2020 11:30:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505663
PE
2950
FACILITY_ID
FA0006930
FACILITY_NAME
ARCO PRODUCTS CO #5450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
02
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Atlantic Richfield Company 4 <br /> ARCO tk5450,1617 west Fremont Street,Stockton,California <br /> November 20,2001 <br /> • Report. A report will be prepared after completion of necessary <br /> fieldwork and upon receipt of laboratory analytical results. The report <br /> will include boring logs and well construction details, a site map, soil <br /> and groundwater analytical results,chain-of-custody documentation, <br /> and findings. <br /> Field and laboratory procedures are presented as Attachment D. <br /> SCHEDULE <br /> SECOR is prepared to initiate fieldwork within 46 weeks following approval of this <br /> work plan by the SJCPHS. A project schedule is included as Figure 3. This time frame is <br /> estimated and the actual time needed may be shorter or longer. <br /> If there are any questions regarding the contents of this work plan,please call us at(916) <br /> 861-0400. <br /> Sincerely, <br /> SECOR International Incorporated <br /> QwoFESS] <br /> Thomas Y. Parker <br /> Staff Geologist <br /> X No.))C],0583�'99�'�, � <br /> * <br /> Up.!. <br /> V C< <S}q cmcOI <br /> Rusty Benkos .E. �0F CA�.�F� <br /> Project Mana <br /> Attachments: Figure 1 - Site Location Map <br /> Figure 2 - Site Map with Proposed Soil Boring Locations and Delta's <br /> 1999 Soil Analytical Results <br /> Figure 3 - Project Schedule <br /> Attachment A - SJCPHS Letter dated July 13, 2001 <br /> Attachment B - Historical Site Data <br /> Attachment C - Site Health and Safety Plan <br /> Attachment D - Field And Laboratory Procedures <br /> cc: Mr. Paul Supple,Atlantic.Richfield Company <br /> Mr. Marty Hartzell, RWQCB <br /> L•ARCW450Awarkpb=\ARCO 5450 WP <br />
The URL can be used to link to this page
Your browser does not support the video tag.