My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2900 - Site Mitigation Program
>
PR0505663
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:50:02 AM
Creation date
1/9/2020 11:31:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505663
PE
2950
FACILITY_ID
FA0006930
FACILITY_NAME
ARCO PRODUCTS CO #5450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
02
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> CHRONOLOGY <br /> ARCO STATION #5450 <br /> 1617 W. Fremont St., Stockton, CA 95203 <br /> LOP SITE: 35.27 Site Code: 505663 <br /> 1995 <br /> 03/15/95 Work plan to over-excavate any contaminated soils discovered during <br /> proposed product line replacement reviewed by Michael Infurna (MI) as <br /> Unit IV Environmental Assessment. Questions left on phone message for <br /> Kyle Christie. <br /> F 04/28/95 2"d call to Kyle since no response form last one. MI explains public <br /> participation and 1 to 2 week comment period. ARCO to be RP stili and <br /> no EA prepayment required. <br /> 05/05/95 Notice of Findings/Pub-Part entered. <br />}. 05/08/95 Site posted. End 5115195. <br /> 05/16/95 No comments received, and site "un-posted". Operator of store verbally <br /> vents to MI about government and environmentalists. <br /> 07/18/95 Kyle calls and post phones work to after Labor Day. <br /> 10/04/95 MI notices site demolition and piping trenches opened up. MI stops and <br /> questions American Construction employee, Joe Martinez, who states'soii <br /> sampling to be with Mike Kith (MK) tomorrow. MI discusses CAP with MK <br /> at office and MK to handle soil sampling under Unit Ill. <br /> 10/05/95 MK files Prop 65 (#95-122) due to odors and soil discoloration in area <br /> �. north of west island. Site to enter LOP due to soil contamination as <br /> 35.27. Over-excavation stopped when obvious soil contam goes under <br /> west island and appears to go westerly and is "un-reachable" as explained <br /> by construction company. American Construction plans to back-fill over- <br /> excavation with pea gravel and MI refers them to COS for requirements <br /> prior to them placing uncompactable soils. <br /> 10/27/95 Site officially enters LOP. NOR mailed today. <br />
The URL can be used to link to this page
Your browser does not support the video tag.