My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2900 - Site Mitigation Program
>
PR0505663
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:50:02 AM
Creation date
1/9/2020 11:31:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505663
PE
2950
FACILITY_ID
FA0006930
FACILITY_NAME
ARCO PRODUCTS CO #5450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
02
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SERGIO MORESCALCHI <br /> ATLANTIC RICHFIELD COMPANY <br /> 'P O BOX 1257 <br /> SAN RAMON CA 94583 <br /> RE: ARCO/BP Sites in San Joaquin County <br /> A meeting was held on September 13,2007, at the office of San Joaquin County Environmental <br /> Health Department(EHD): Attending the meeting were you representing ARCO/BP,Rusty <br /> Benkosky and Brian Westhoff representing SECOR,Margaret Lagorio,Nuel C. Henderson,Michael <br /> Infurna,Lori Duncan,and Vicki McCartney representing EHD. The following is a synopsis of the <br /> status and/or site specific discussions at the meeting. <br /> 2478 E. Oak Street,'Stockton, #443 <br /> The report on the installation of the new wells should be submitted to EHD soon. It has been <br /> about three months since the work was completed. <br /> 1612 Hammer Lane,,Stockton, 4548 <br /> The off-site property owners have not signed the access agreements for installation of wells on their <br /> property. SECOR will send another request and if there is still no cooperation EHD will request <br /> cooperation once SECOR provides copies'of correspondence sent to those property owners. The <br /> City of Stockton is making improvements along Hammer Lane and some of the wells at 1612 <br /> Hammer may need.to be destroyed: The EHD will provide more information on;this when it <br /> becomes available. i <br /> 6100 N. Highway 99,Stockton, #595 <br /> Monitoring of the two wells remaining for,this site will continue until the California Department of <br /> Transportation has completed construction of the highway interchange. <br /> 1 <br /> 7906 N. El Dorado Street,Stockton, #2130 <br /> New wells have'been installed for the site. The on-site vapor well will be scheduled for destruction i <br /> soon. <br /> 441 Charter Way, Stockton,#2168 I <br /> The inlet on the air sparge system melted so the system is not operating. Once the inlet is repaired <br /> the system will resume operation. The soil vapor extraction system is operating. <br /> 3212 N. California Street, Stockton, #2186 <br /> The EHD approved the soil vapor extraction rebound plan. A Site Conceptual Model should be <br /> submitted to EHD this week. A response to moving VP-1 will be submitted to EHD in a week. <br />
The URL can be used to link to this page
Your browser does not support the video tag.