My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2900 - Site Mitigation Program
>
PR0505663
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:50:02 AM
Creation date
1/9/2020 11:31:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505663
PE
2950
FACILITY_ID
FA0006930
FACILITY_NAME
ARCO PRODUCTS CO #5450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
02
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!1 <br /> 205 N. Center Street.Stockton, #4493 <br /> ARCO plans to continue monitoring the contaminant plume from this site. The EHD previously <br /> recommended batch extraction of groundwater'in the area-of MWS and MW12 to reduce mass and <br /> speed up the possibility of closure. ARCO was concerned it would-move more solvent constituents <br /> to the site that are not considered to be from the ARCO site. This remediation will be further <br /> discussed by ARCO.and SECOR. <br /> 16 E. Hardin.gWaj,Stockton #4932 <br /> The EHD will approve the proposed work plan. ARCO will work with ConocoPhillips on <br /> installation of a remediation system for the MTBE that has migrated onto their site at 1502 N. El I <br /> Dorado. <br /> 1617 W. Fremont Street, Stockton, #5450 <br /> The plan for destruction of the monitoring wells has been approved by EHD and the work is to be <br /> scheduled. <br /> 130_S._Wilson Way, Stockton. #5469 <br /> The Site Conceptual Model has been submitted and concludes that the contaminant plumes from <br /> 101 S.Wilson Way and 102 S.Wilson Way are commingled with the contaminant plume from this <br /> site. The EHD is in agreement with this conclusion and encourages ARCO to contact the other <br /> responsible parties about entering into a commingled plume agreement.and applying to the State <br /> Water Resources Control Board Cleanup,Fund for'reimbursement of corrective action costs. There <br /> are three monitoring wells proposed for installation off-site. The property owner verbally agreed but <br /> has not signed the access agreement. ARCO will follow-up.on obtaining the access agreement. <br /> ARCO will consider upgrading the currently operating ozone system to a system that injects a greater <br /> amount of ozone per hour. I� <br /> .. a <br /> 85 Louise Avemie,Lathrop, 6080 l <br /> A work plan for destruction of the monitoring wells is to be submitted to EHD. <br /> 25775 S. Patterson Pass.Tracy. #6100 ' <br /> SECOR prepared an Assessment Report for the site and did not feel they could estimate the mass of <br /> contamination at the site. EHD agree that it would be difficult given the complexity of the site. <br /> SECOR will measure vapor coming out of individual wells and propose destruction of any wells that <br /> do not have any vapor concentrations and are not necessary for remediation. The EHD will discuss <br /> this site with the Central Valley Regional Water Quality Control Board (CVRWQCB). If the <br /> CVRWQCB concurs that the site is defined, the EHD will require submittal of a Final Corrective <br /> Action Plan and conduct public participation. <br /> If you have any questions or comments please contact the appropriate LOP staff overseeing the site <br /> or call me at-(209) 468-3449. <br /> Donna Heran,RENS,Director <br /> Environmental Health Department <br /> Margaret Lagorio,REHS <br /> Program Coordinator Unit IV <br /> c: CVRWQCB—James L.L. Barton,RG } <br /> SECOR—Rusty Benkosky, Brian Westhoff <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.