Laserfiche WebLink
San Joaquin County DIRECTOR <br /> p C]t? N Donna Heran,REHS <br /> Environmental Health Department ASSISTANT DIRECTOR <br /> �. Mr :� 6aa East Maln,Street Laurie Cotulla,REHS <br /> U': Stockton, California 95202-3029 <br /> PROGRAM COORDINATORS <br /> Carl Borgman, REHS <br /> Website; www.s ov.or /ePd Mike Huggins,RENS,RDI 19 9 MargaretLagorlo,.REHS <br /> Phone: (209)46$-3420 Robert.McClellon,REHS <br /> Fax: (209).464-0138 Jeff Carruesco, REHS,RDi <br /> Kasey Foley,REHS <br /> SERGIO MORESCALCHI ! <br /> ATLANTIC RICHFIELD COMPANY SEP 17 2007 <br /> P O BOX 1257 <br /> SAN RAMON CA 94583 <br /> RE: ARCD/BP Sites in San Joaquin County <br /> a <br /> A meeting was held on September 13,2007, at the office of San Joaquin County Environmental <br /> Health Department (EHD). Attending the meeting were.you representing ARCO/BP,Rusty <br /> Benkosky and Brian Westhoff representing SECOR,Margaret Lagorio,Nuel C. Henderson,Michael <br /> Infurna,Lori Duncan, and Vicki McCartney representing EHD. The following is a synopsis of the <br /> status and/or site specific discussions at the meeting" <br /> 2478 E. Oak Street, Stockton. #443 . <br /> The report on the installation of the new wells should be submitted to EHtD soon. It has been <br /> about three months since the work was completed. <br /> 1612 Hammer Lane, Stockton,'#548 <br /> The off-site property owners have not signed the access agreements for installation of wells on their <br /> property. SECOR will send another_request and..if there is still no cooperation EHD will request <br /> cooperation once SECOR provides copies of correspondence sent to those property owners. <br /> SECOR will check into putting the well to the east in the public right-of way. The City of Stockton <br /> is making improvements along Hammer Lane and some of the wells at 1612 Hammer may need to <br /> be destroyed. The EHD will provide more in on this when it becomes available. <br /> 6100 N. Highiway Highway99 Stockton #595 <br /> Monitoring of the two wells remaining for this site will continue until the California Department of <br /> Transportation has completed construction of the highway interchange. <br /> 7906 N. El Dorado Street,Stockton. #2130 <br /> New wells have been installed for the site. The on-site vapor well will be scheduled for destruction <br /> soon. <br /> 441 Charter Way,Stockton #2168 <br /> The inlet on the air sparge system melted so the system is not operating.. Once the inlet is repaired <br /> and the system is modified it will resume operation. The soil vapor extraction system is operating. <br /> 3212 N. California Street Stockton,,#2186 <br /> The EHD approved the soil vapor extraction rebound test plan. A Site Conceptual Model should be <br /> submitted'to EHD this week. A response to moving VP-1 will be submitted to EHD in a week. <br /> 205 N. Center Street, Stockton. #4493 <br /> ARCO plans to continue monitoring the contaminant plume from this site.- The EHD previously <br /> recommended batch extraction of groundwater in the area of the MW4/M%V8/MW12-well cluster to <br /> reduce mass and speed up the possibility of closure. ARCO was concerned it would move more <br /> I, <br /> I <br /> 4 <br />