My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011170
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2900 - Site Mitigation Program
>
PR0505663
>
ARCHIVED REPORTS_XR0011170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 12:02:31 PM
Creation date
1/9/2020 11:39:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011170
RECORD_ID
PR0505663
PE
2950
FACILITY_ID
FA0006930
FACILITY_NAME
ARCO PRODUCTS CO #5450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
02
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date; January 5,2005 <br /> r Ouarter: 4's Quarter,2004 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No.: 5450 <br /> Address: 1617 West Fremont Street, Stockton, CA <br /> ARCO Environmental Engineer: Paul Supple <br /> Consulting Co./Contact Person: URS/Jeff rey Brooks <br /> Consultant Project No.: 38466523.01-058 <br /> Primary Agency/Regulatory ID No.: San Joaquin County Environmental Health Department <br /> Assembly Bill 681 Status: Property owned by Atlantic Richtield Company <br /> WORK PERFORMED THIS QUARTER (Fourth 2004): <br /> 1. Performed quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted quarterly groundwater monitoring report. <br /> 3. Prepared and submitted Sensititve Receptor Survey report. <br /> WORK PROPOSED FOR NEXT QUARTER (First 2005): <br /> 1. Perform quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit quarterly groundwater monitoring report. <br /> QUARTERLY RESULTS SUMMARY (Fourth 2004): <br /> Current Phase of Project: Monitoring <br /> Frequency of Groundwater Sampling: MW-2 through MW-4 sampled quarterly <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product (FP) Present Onsite: No <br /> Current Remediation Techniques: Natural attenuation <br /> Approximate Depth to Groundwater: 11.18—11.52 feet below ground surface (bgs) <br /> Groundwater Flow and Gradient: ^Southeast @ 0.004 feet/foot(ft/ft) <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks,dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results,and surrogate recoveries), the data are acceptable as reported by the laboratory <br /> with the following limitation: <br /> • The reported results for gasoline range organics (GAO) in samples MW-2, MW-3, and MW-4 may be <br /> biased low since the analyses for these analytes were performed 1 day beyond the U.S. EPA recommended <br /> holding time of 14 days. <br /> K%Wpro mVS BP ARC0\054501Quaner1y0004\4 QTR 04\5450 GWW 4Q04.doc Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.