Laserfiche WebLink
1 <br /> l <br /> Nor-Cal Beverage Co. 2 <br /> . 20 July 1992 <br /> Nor-Cal -must also conduct a survey to identify other wells such as <br /> agricultural , municipal , industrial , and domestic wells, in the vicinity. The j <br /> presence of pumping wells near the site may have an impact on the. direction of <br /> ground water flow. ' <br /> By 15 August 1992, Nor-Cal must submit a work plan for installing at least two <br /> new wells and the additional soil investigation. . The next quarterly report, <br /> due 15 October 1992, is to include:: the survey of nearby wells. A Problem <br /> Assessment Report is due by 15 December 1992 which follows Appendix A to the <br /> Tri-Regional Recommendations (enclosed) . <br /> If you have any questions, please call me at (916) 361-5726. <br /> ELIZ E A. THAYER <br /> Asso 'ate Engineer <br /> Enclosures <br /> i <br /> f <br /> i <br /> J. <br />