Laserfiche WebLink
I <br /> N <br /> 1117 Lone Palm Avenue, Suite 201 <br /> (YA <br /> Modesto, California 95351 <br /> -2225 209-579-2221 <br /> Fax: 209-579-2225 <br /> A 8 B p C I A T E B I N ) / <br /> groundwater samples collected by ATC is presented in Table 3. The monitoring well locations are <br /> shown on Figure 3 . <br /> SCOPE OF WORT; <br /> This Workplan has been prepared to conduct a vapor extraction pilot test, ozone sparge test and air sparge <br /> pilot test. Additionally, performing all ozone bench scale test, if applicable, preparation of a site <br /> conceptual model , and conducting a sensitive receptor survey are included in conjunction with the pilot <br /> testing activities. Tine pilot test data will be utilized to determine the feasibility of vapor extraction, <br /> ozone sparge, and air sparge technology and to design a soil and groundwater rennediation system. The <br /> scope of work includes: modification as appropriate of the Health and Safety Plan on file with the <br /> SJCEHD; installation of four soil vapor extraction wells and three sparge wells; conducting a vapor <br /> extraction pilot test, ozone pilot test and air sparge test; soil and vapor sampling; completion of a receptor <br /> survey; preparation of a site conceptual model; and preparation of a report summarizing the results of the <br /> proposed activities. Each scope of work is described below. <br /> Permitting <br /> ATC will schedule field personnel and equipment, notify Underground Services Alert to locate <br /> underground utilities as required, and perform other necessary field preparation and job start-up activities. <br /> A private utility locating service will also be used to locate underground utilities that may be present in <br /> the work areas. A drilling permit application will be completed and submitted to the SJCEHD prior to <br /> initiation of drilling activities. <br /> PILOT TEST WELL INSTALLATION <br /> The pilot test well construction details for the proposed SVE and AS wells were designed using recent <br /> and historical groundwater elevation and analytical data. The vertical and lateral distribution of known <br /> soil contaminant impact in conjunction with the lithologic variations observed beneath the site was also <br /> considered. <br /> Vapor Extraction Well Installation <br /> Prior to conducting the vapor extraction pilot test, four SVE wells (VE- I , VE-2 VE-3 , and VE4) will be <br /> installed using a hollow stem auger equipped drill rig. ri nng will be conducted b�icensed <br /> (C57) drilling company. Figure 4, Proposed Pilot Test Well Location Map, illustrates the location of the <br /> proposed vapor extraction wells. Soil samples will be collected at five foot intervals for lithologic j <br /> logging purposes and will be field screened for volatile organic compounds (VOCs) with a <br /> photoionization detector (PID). Descriptions of soil types, lithologic features, PID readings, blow counts, <br /> soil-groundwater interface and sample locations will be recorded on boring logs. Selected soil samples <br /> collected during drilling (samples exhibiting the greatest PID readings) will be placed in a cooler with ice <br /> and delivered under chain-of-custody documentation to a State-certified analytical laboratory. <br /> Additionally, sufficient soil will also be collected for ozone bench scale testing. The ozone betnch scale <br /> testing procedures are described in later sections of this Workplan. <br /> Workplan for Feasibility studies — former Stockton Taxi Company ATC Associates Inc. <br /> 5:..528349\ V✓P for Pilot Testing and SCM ATC Project No. 54.28349.0001 <br /> 4 <br />