Laserfiche WebLink
1 117 Lone Palm Avenue, Suite 201 <br /> Modesto, California -2221 <br /> \\V%/ 209-579-2221 <br /> Fax: 209-579.2225 <br /> i <br /> A S S O C I A T E S INC . <br /> I <br /> I <br /> The SVE wells will be constructed of 4-inch inside diameter schedule 40 PVC well screen and casing. <br /> Each welt will be installed within the vadose zone to a depth of approximately 40 feet-bp- with <br /> approximately 30 feet of 0.020 inch slot screened PVC. A sand pack using I6 Monterey sand will be <br /> placed in a annulus o eac i we I extending from the bottom of the well screen to approximately two <br /> feet above the top of the screen. Approximately three feet of hydrated bentonite chips will be placed on <br /> top of the sand pack. A bentonite cement slurry mixture will be tremi grouted from the top of the <br /> bentonite layer to approximately two Feet below surface grade. Surface completions will consist of a <br /> watertight bolt-down wellhead secured in Portland cement. To protect the integrity of well , locking, <br /> watertight well plugs will be installed on each well . Appendix A shows the proposed well construction <br /> details. <br /> Sparge Well Installation <br /> Prior to conducting the sparge pilot tests, ATC will install three dual nested sparge wells using H2O <br /> Engineering sparge point well assembly. Designated sparge wells SP- 1 , SP-2, and SP-3 will each contain <br /> two nested ozone sparging points that will be screened within specific tithologic intervals set at <br /> approximately 60� and 80 to 85 fee bgs. /v a wzA, (� � +M 4l y a 4' Tl <br /> The borings for the sparge wells will be advanced using a hollow stem auger rig equipped with 10411ch <br /> outside diameter (5%" or 6'/a" inside diameter) augers, Figure 4, Proposed Pilot Test Well Location Map, <br /> illustrates the location of the proposed sparge wells. Soil samples will be collected at five to ten foot <br /> intervals for tithologic logging purposes. Descriptions of soil types, lithologic features, PID readings, <br /> blow counts, soil-groundwater interface and sample locations will be recorded on boring logs. Soil <br /> samples will be field screened for VOCs using a PID. Selected soil samples collected during drilling <br /> (samples exhibiting the greatest PID reading and the sample directly above the water bearing unit) will be <br /> placed in a cooler with ice and delivered under chain-of-custody documentation to a State-certified <br /> analytical laboratory for analyses. <br /> Dual nested sparge wells will be constructed and placed at appropriate depths. Each sparge well screen <br /> will consist of 1 . 5 feet of 2-inch diameter porous (25 micron pore size) PolyVinyliehne DiFluoride <br /> (PVDF) In-situ Oxidation Points (10P)�. The IOP, designed and manufactured by H2O Engineering, are <br /> constructed from ozone-resistant PVDF, a highly non-reactive and pure thermoplastic fluoropolymcr also <br /> known as Kynaro. Each well screen will be designed with a Vitone O-ring seal and fitted with 2-inch <br /> diameter schedule 80 PVC riser pipe (RP). Within the well box , flue RP will be fitted with a water/air <br /> tight wellhead connection (WIJQ designed from schedule 80 PVC material that will be used to facilitate <br /> sparging. <br /> Approximately 2 feet of #2/ 16 Monterey sand will be placed above each respective AS well screen <br /> followed by a minimum of three feet of hydrated bentonite chips. A bentonite cement slurry mixture will j <br /> be tremi grouted from the top of the bentonite layer of the shallowest AS well point to approximately two <br /> feet below surface grade. Surface completions will consist of a watertight bolt-down wellhead set in <br /> Portland cement. Appendix A shows the proposed well construction details. <br /> Workplan for feasibility. Studies — Former Stockton Taxi Company ATC Associates Inc. III <br /> S:._\28349\ wP for Pilot Testing and SCM ATC Project No. 54.28349.0001 <br /> 5 <br />