My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2494
>
2900 - Site Mitigation Program
>
PR0506171
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 4:28:07 PM
Creation date
1/9/2020 4:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506171
PE
2950
FACILITY_ID
FA0003863
FACILITY_NAME
SOHAL #3
STREET_NUMBER
2494
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15328008
CURRENT_STATUS
02
SITE_LOCATION
2494 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U � <br /> CAM B R I A <br /> Well Head Survey: The longitude, latitude, and elevation of the newly installed wells will be <br /> surveyed by a licensed surveyor per the State of California Geotracker standards. <br /> Chemical Analyses: Soil and groundwater samples from borings SB-26 and SB-27, and wells <br /> S-7 and S-8 will be analyzed for total petroleum hydrocarbon as gasoline (TPHg), benzene, <br /> toluene, ethylbenzene, and xylenes (BTEX),fuel oxygenates (methyl tertiary butyl ether, tertiary <br /> amyl methyl ether, ethyl tertiary butyl ether, and di-isopropyl ether) and lead scavengers <br /> (1,2dichloroethane and ethylene dibromide)by EPA Method 8260. <br /> © Report Preparation: Within 60 days of the receipt of analytical results from the laboratory, <br /> Cambria will prepare a written report which will include documentation of the activities <br /> presented in this work plan. <br /> SCHEDULE <br /> Cambria is prepared to initiate this work upon written approval of this work plan by EHD. An <br /> access agreement will be sought once EHD has agreed to the location of the proposed borings <br /> and wells. The actual date of field work is contingent on driller availability and receipt of an <br /> approved permit and access agreement. <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707)933-2361. <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> "Neely, � GEJJoe W. D AftiF RG O�5 �QN W <br /> Senior Project Geologistyy <br /> RG 6927 <br /> • No.6927 <br /> s <br /> ��OFCAU <br />
The URL can be used to link to this page
Your browser does not support the video tag.