My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GUILD
>
715
>
2231-2238 – Tiered Permitting Program
>
PR0526078
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2020 10:46:08 AM
Creation date
1/10/2020 9:52:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0526078
PE
2232
FACILITY_ID
FA0016140
FACILITY_NAME
LUSTRE CAL NAMEPLATE CORPORATION
STREET_NUMBER
715
Direction
S
STREET_NAME
GUILD
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04931024
CURRENT_STATUS
01
SITE_LOCATION
715 S GUILD AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank Compliance Proposal Lodi, California { FR(7,t"IF f <br /> February 21, 2019 Terracon Proposal No. PN13197048 <br /> 3. Our assessment will be submitted in report form and will include individual assessments <br /> of each tank and secondary containment unit. The assessment report will be provided <br /> in a form that meets the SJCEHD required reporting documentation. We will provide <br /> three copies of the assessment and letter of certification, stamped by a registered <br /> Professional Engineer, licensed in the State of California. <br /> 3.0 SCHEDULE AND FEE <br /> Terracon estimates that the Assessment Report will be submitted to the client within 20 business <br /> days following receipt of authorization to proceed. The actual project schedule will be based on <br /> the access and resource availability/potential schedule delays. If schedule delays are anticipated, <br /> the client will be contacted to discuss changes in the schedule. <br /> The Scope of Services outlined in this proposal will be conducted for a lump sum fee of$5,950. <br /> ESTIMATED PROJECT COST <br /> Task Costs <br /> Assessment Preparation (Project Management; Health & Safety $1,750 <br /> Plan, Field Inspections, Equipment&Travel) <br /> Site Observations/Measurements $1,200 <br /> Secondary Containment&Tank Seismic Calculations $1,500 <br /> Document Preparation, Review, and Sealing $1,500 <br /> ESTIMATED TOTAL $5,950 <br /> We appreciate the opportunity of presenting our proposal and are looking forward to working with <br /> you on this project. Attached you will find our Agreement for Services. If this proposal meets your <br /> approval, please return a signed copy. Based on our current work load, we estimate time for <br /> completion of the scope of work is 4 weeks upon receipt of authorization to proceed. If you have <br /> any questions, please call. <br /> Sincerely, <br /> Terracon_Consultants, In <br /> Scott Gable, P.G. Garret Hubbart, E. <br /> Environmental Department Manager Office Manager <br /> Responsive Resourceful Reliable 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.