My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LONGE
>
7910
>
2231-2238 – Tiered Permitting Program
>
PR0536175
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 10:23:20 AM
Creation date
1/10/2020 10:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0536175
PE
2231
FACILITY_ID
FA0012466
FACILITY_NAME
PREMIER FINISHING
STREET_NUMBER
7910
Direction
S
STREET_NAME
LONGE
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
7910 S LONGE
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Backus, Garrett <br /> From: Chris Young <chris@premierfinishing.com> <br /> Sent: Thursday, October 17, 2019 11:54 AM <br /> To: Backus, Garrett;Alaniz,John <br /> Subject: RE: RTC haz waste treatment <br /> Attachments: PF-Storage Map_7910_(CY2).pdf; Pressure washer zoomed in_(CY1).pdf; Process 1 - <br /> Ultra Clean - Phosphate_(CY1).pdf, Process 2-Chemline Conversion_(CY1).pdf <br /> Good morning John and Garrett, <br /> Attached is the updated maps, that I will be uploading into CERS today to complete RTC violation 113. <br /> For RTC violation 214 the samples had to be retaken to perform the stic and tclp tests,then sent to the lab. I'm just <br /> waiting on the test results to come back in. <br /> As for RTC 213 1 had a small problem but it is in the process of being taken care of. I was told this guy gary was PE <br /> certified, it turns out he is not. He has all kinds of certifications but not the PE.A guy from NES is working on getting a PE <br /> out here for me. <br /> Any questions please do not hesitate to contact me. Thanks <br /> Have a great day, <br /> Chris Young <br /> From: Backus, Garrett<gbackus@sjgov.org> <br /> Sent: Monday, September 30, 2019 11:28 AM <br /> To: Chris Young<chris@premierfinishing.com> <br /> Cc:Alaniz,John <jalanizl@sjgov.org>; Craig Walters<craig@premierfinishing.com> <br /> Subject: RE: RTC haz waste treatment <br /> Hi Chris, <br /> We still need information for all of these violations. <br /> Violation 109 can be closed with a legible, signed copy of the phase 1 environmental assessment checklist. <br /> Violation 113- The plot plan needs details showing where the pressure washer water is stored and where/how it is <br /> transferred to the treatment system. <br /> Violation 213—The closure certification must be certified by a Professional Engineer. Include the PE stamp on the <br /> closure certification. <br /> Violation 214—The waste analysis plan still needs the details listed below. <br /> Thank you, <br /> Garrett <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.