My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2804
>
3500 - Local Oversight Program
>
PR0545172
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 10:57:22 AM
Creation date
1/13/2020 10:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545172
PE
3528
FACILITY_ID
FA0009349
FACILITY_NAME
DIESEL PERFORMANCE INC
STREET_NUMBER
2804
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14343001
CURRENT_STATUS
02
SITE_LOCATION
2804 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc. <br /> V1117 Lone Palm Avenue,.SUite 201 <br /> Modesto,California 95351 <br /> ..209-579-2221 <br /> A s s o c I ATE S J rr c. Fax: 209-579-2225 <br /> f concentrations of petroleum hydrocarbons. Field activities and, analytical results are detailed in <br /> ATC's Summary Report of Additional Subsurface Investigation, dated January 8, 1999. <br /> In December 1999,. ATC personnel supervised the advancement of soil borings'MW2, MW3, <br /> and MW4 each to a depth of approximately 65 feet bgs to evaluate groundwater .for the <br /> presence of petroleum hydrocarbons and to determine the groundwater gradient direction and <br /> magnitude. Each boring was completed as a monitoring well. Analytical data indicated that soil <br /> samples collected from boring MW2. contained detectable concentrations of petroleum <br /> hydrocarbons. Petroleum hydrocarbons were also detected in the groundwater "sample <br /> collected from monitoring well MW2.,A groundwater sample collected from MW3 contained very <br /> low concentrations of only a few of the petroleum analytes. Petroleum hydrocarbons were not <br /> detected in the groundwater sample obtained from MW4. Field activities and analytical results <br /> are summarized in ATC's Summary .Report of Additional Subsurface Investigation, dated <br /> February 24, 2000. <br /> In December 2001, soil boring VEW1 was advanced to approximately 35 feet.bgs, and borings <br /> VEW2 and VEW3 were each advanced to an approximate depth of 45 feet bgs. Borings MW5,. <br /> MW6, and MW7 were each advanced to approximately 65 feet-bgs and were completed as 2- <br /> inch diameter groundwater monitoring wells. Soil borings VEW1, VEW2, land VEW3 'were <br /> wells. Boris <br /> completed as 2-Inch diameter vapor extraction g CPT1 was advanced to <br /> approximately 100'feet bgs utilizing a truck-mounted Cone Penetrometer Testing (CPT) rig. <br /> In 2002, ATC perfotmed a soil vapor extraction (SVE) ,pilot test using mobile extraction <br /> equipment that yielded a radius of influence (ROI) of approximately 30 feet at a.vacuum of 11.5.' <br /> inches of water. Approximately 2.64 pounds of total petroleum hydrocarbons were removed <br /> from the subsurface during the pilot test. Field activities and analytical results are presented in <br /> ATC's Remedial Investigation Feasibility Study dated November 19, 2002. <br /> From October 2004 to August 2006, ATC performed additional SVE system tests to provide <br /> information from which an efficient and effective permanent SVE system:could be designed. <br /> In December 2006, ATC completed permitting and began installation of a SVE system with <br /> startup of the system occurring on January 17, 2007. The system continued operating until <br /> February 13, 2009, -when volatile organic vapor concentrations became too low to justify <br /> sustained continuous operation. On July 14, 2009, after.151 days of non-operation, the SVE <br /> I` system was restarted in.order to conduct a rebound test. Concentrations of volatile organic <br /> compounds (VOCs) measured from the influent air stream were determined to not significantly . <br /> increased beyond the concentrations measured prior to, the system shut down in February <br /> 2009. The SVE system rebound test supported historical data that indicated influent vapor, <br /> r phase hydrocarbon concentrations had decreased to levels that warranted terminating system <br /> operations. The test also suggested that cycling ahe system-would. not be, a cost effective <br /> alternative. <br /> During operation of the SVE system between January 17, 2007 and February 13, 2009, the <br /> system operated for..a total of 16,500 hours and successfully removed an estimated 5,436.76 <br /> SAEnviromental162577-Diesel Pert\REPQRTSIWP-Well Abandonment' 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.