My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
5709
>
2900 - Site Mitigation Program
>
PR0523858
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 4:20:56 PM
Creation date
1/14/2020 3:34:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523858
PE
2960
FACILITY_ID
FA0016067
FACILITY_NAME
FORMER BUFFALO TANK
STREET_NUMBER
5709
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
10123019
CURRENT_STATUS
01
SITE_LOCATION
5709 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06 January 2003 <br /> AGE-NC Project No. 02-0896 <br /> Page 7 of 7 <br /> Ground water samples will be collected into laboratory supplied containers. Ground water samples <br /> for BTEX, TPH-g, fuel oxygenating compound, and lead scavenger compound analyses will be <br /> collected into laboratory-supplied, 40-m1 VOA vials containing 0.5-m1 of hydrochloric acid as <br /> preservative.Following collection the samples will be appropriately labeled,placed on ice and kept <br /> in a cooler until delivered to the laboratory for analysis. Chain-of-custody protocols will be used to <br /> document sample custody transfer from the field to the analytical laboratory. A chain-of-custody <br /> form will accompany the samples. <br /> Detection limits for all analytes will be as follows: <br /> • TPH-g and Methanol- 50 µg/1 <br /> • BTEX, EDB, 1,2-DCA, MTBE, DIPE, ETBE, and TAME - 0.5 µg/1 <br /> • TBA and Ethanol - 5.0 µg/1 <br /> Deviations from these detections limits will be explained in the laboratory analytical report. <br /> 4.3. EQUIPMENT DECONTAMINATION <br /> All sampling tools used for sample collection will be thoroughly washed with a solution of Alconox <br /> and rinsed with clean water prior to use. All down-hole drilling and sampling equipment will be <br /> pressure washed prior to starting each boring. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.