My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
401
>
2900 - Site Mitigation Program
>
PR0524769
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 5:14:37 PM
Creation date
1/14/2020 4:21:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0524769
PE
2960
FACILITY_ID
FA0016627
FACILITY_NAME
PG&E FRENCH CAMP YARD
STREET_NUMBER
401
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19314013
CURRENT_STATUS
02
SITE_LOCATION
401 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> SECOND QUARTER 2008 GROUNDWATER MONITORING REPORT <br /> FRENCH CAMP GENERAL CONSTRUCTION YARD <br /> L 401 EAST FRENCH CAMP ROAD <br /> FRENCH CAMP,CALIFORNIA <br /> PN: 050T.50351.02 <br /> Limitations and Certifications <br /> This report was prepared in accordance with the scope of work outlined in Stantec Consulting <br /> Inc.'s.(Stantec)formerly SECOR's contract and with generally accepted professional <br /> engineering and environmental consulting practices existing at the time this report was prepared <br /> and applicable to the location of the site. It was prepared for the exclusive use of Pacific Gas <br /> L and Electric Company and the Regional Water Quality Control Board (RWQCB). Any re-use of <br /> this report for a different purpose or by others not identified above shall be at the user's sole risk <br /> without liability to Stantec. To the extent that this report is based on information provided to <br /> Stantec by third parties, Stantec may have made efforts to verify this third party information, but <br /> Stantec cannot guarantee the completeness or accuracy of this information. The opinions <br /> expressed and data collected are based on the conditions of the site existing at the time of the <br /> field investigation. No other warranties, expressed or implied are made by Stantec. <br /> Prepared by: Reviewed by: <br /> L <br /> Anna Radon ich Neil Doran <br /> LProject Scientist Senior Geologist <br /> L <br /> Information, conclusions, and recommendations provided by Stantec in this document have <br /> been prepared under the supervision of and reviewed by the licensed professional whose <br /> L signature appears below. <br /> r Licensed Approver: <br /> L <br /> �L <br /> Bruce E. Scarb ough, P.G. 31 �� BRUCE. <br /> Principal Geologist a SCARBROUGH <br /> No.49.31 <br /> (o/01 <br /> L �pF CAL��O� <br /> L <br /> I L is i:\pg&e\french camp\groundwater monitonng\"y 2008 m0nitonng\gmr rpt_fnl.doc L.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.