Laserfiche WebLink
Stantec <br /> SECOND QUARTER 2008 GROUNDWATER MONITORING REPORT <br /> Groundwater Monitoring Results <br /> July 7,2008 <br /> 4.0 Groundwater Monitoring Results <br /> Based on depth-to-water measurements, groundwater flow beneath the Site during the May <br /> 2008 monitoring event was toward the south at a gradient of 0.0037 feet per foot (ft/ft). Depth- <br /> to-water measurements and well construction details are presented in Table 1 and a <br /> potentiometric surface map is illustrated on Figure 3. <br /> TPHd was reported at 98 pg/L in the sample from well MW-2. No other constituents of concern <br /> were reported at or above laboratory reporting limits. Groundwater analytical results are <br /> presented in Table 2 and the laboratory analytical report is attached as Appendix A. <br /> L <br /> L� <br /> is i:\pg&e\french camp\groundwater monitoringtrrnay 2008 monitonng\gmr rpt_fnl.doc 4.1 <br />