My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
401
>
2900 - Site Mitigation Program
>
PR0524769
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 5:08:21 PM
Creation date
1/14/2020 4:25:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524769
PE
2960
FACILITY_ID
FA0016627
FACILITY_NAME
PG&E FRENCH CAMP YARD
STREET_NUMBER
401
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19314013
CURRENT_STATUS
02
SITE_LOCATION
401 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.t <br /> Mr. Michael J. Infurna Jr. <br /> December 9, 2005 <br /> Page 3 <br /> also present conclusions and recommendations for additional investigation if appropriate. <br /> The report will be submitted to PG&E for comments and edits and a revised report will be <br /> submitted to PG&E and a copy of the revised report will be submitted to SJCEHD. <br /> SCHEDULE <br /> The field work is scheduled for Monday, December 19, 2005. As required, SJCEHD will be <br /> notified at least 48 hours prior to the field work. The analytical results will be submitted for <br /> normal turn-around times and are expected to be received in approximately two to three <br /> weeks. These results may delayed somewhat by the holiday season. SECOR anticipates <br /> that a draft report will be submitted to PG&E for review and comment and a revised report <br /> will be submitted to PG&E and to SJCEHD within one week of receipt of comments. <br /> SECOR appreciates the cooperation afforded by SJCEHD in facilitating a quick review of <br /> this work plan. <br /> If you have any questions or require additional information, please call (916) 861-0400. <br /> Sincere) ours <br /> Y yours, 1AL GE�0z0 <br /> rSECOR International Incorporated Qy D H,gFc� c�Tk <br /> • Exp (4=0 <br /> Gary D. Haeck, Ph.D., P.G. s��T No.6046 OP�\� <br /> Senior Geologist FOP CA�`F <br /> !.� Figures: Figure 1 Site Location Map <br /> Figure 2 Site Plan and Proposed Boring Locations <br /> Attachments: Attachment 1: Well Permit Application <br /> Attachment 2: Master File Record Information <br /> Attachment 3: Site Specific Health and Safety Plan <br /> L� <br /> lAPGBE\PM\work plan PZ Il.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.