Laserfiche WebLink
�.t <br /> Mr. Michael J. Infurna Jr. <br /> December 9, 2005 <br /> Page 3 <br /> also present conclusions and recommendations for additional investigation if appropriate. <br /> The report will be submitted to PG&E for comments and edits and a revised report will be <br /> submitted to PG&E and a copy of the revised report will be submitted to SJCEHD. <br /> SCHEDULE <br /> The field work is scheduled for Monday, December 19, 2005. As required, SJCEHD will be <br /> notified at least 48 hours prior to the field work. The analytical results will be submitted for <br /> normal turn-around times and are expected to be received in approximately two to three <br /> weeks. These results may delayed somewhat by the holiday season. SECOR anticipates <br /> that a draft report will be submitted to PG&E for review and comment and a revised report <br /> will be submitted to PG&E and to SJCEHD within one week of receipt of comments. <br /> SECOR appreciates the cooperation afforded by SJCEHD in facilitating a quick review of <br /> this work plan. <br /> If you have any questions or require additional information, please call (916) 861-0400. <br /> Sincere) ours <br /> Y yours, 1AL GE�0z0 <br /> rSECOR International Incorporated Qy D H,gFc� c�Tk <br /> • Exp (4=0 <br /> Gary D. Haeck, Ph.D., P.G. s��T No.6046 OP�\� <br /> Senior Geologist FOP CA�`F <br /> !.� Figures: Figure 1 Site Location Map <br /> Figure 2 Site Plan and Proposed Boring Locations <br /> Attachments: Attachment 1: Well Permit Application <br /> Attachment 2: Master File Record Information <br /> Attachment 3: Site Specific Health and Safety Plan <br /> L� <br /> lAPGBE\PM\work plan PZ Il.doc <br />