My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
401
>
2900 - Site Mitigation Program
>
PR0524769
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 5:08:21 PM
Creation date
1/14/2020 4:25:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524769
PE
2960
FACILITY_ID
FA0016627
FACILITY_NAME
PG&E FRENCH CAMP YARD
STREET_NUMBER
401
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19314013
CURRENT_STATUS
02
SITE_LOCATION
401 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[ [ [ r ► l t [ ► ► r ► ► ► t ► [ [ [ <br /> Field staff must review job-specific work plan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including,but not limited to,permitting,access <br /> agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of each <br /> workda . Plan,Prevent,Execute TXLLnrocedures must be used throughout the pLoject. Weather conditions heat,cold,rain, li htnin )must also be considered. <br /> 0 Job Steps 19 Personal Protective Equipment 0 Potential Hazard 0 Critical Actions <br /> Tools and keys to open wells <br /> Field Book <br /> Zip loc bags <br /> Garbage bags <br /> Knee pads or a kneeling pad <br /> Alconox <br /> Distilled Water <br /> Interface Probe <br /> Sunblock/Insect Repellant <br /> First Aid&Blood home Path.Kit <br /> Eye Wash Bottle <br /> Fire Extinguisher <br /> Drum(if applicable)for purge water <br /> containment <br /> Proper label for drum <br /> Dust pan and hand broom <br /> Visuallyclear proposed drilling Wear reflective vest for traffic,steel Underground and overhead <br /> p p g 19 Complete Pre-Mobilization section of Utility Clearance Review form(Attachment <br /> locations. toed and shank shoes,hardhat,safety installations. <br /> 4)and adjust drilling locations as necessary. <br /> glasses with side shields,and leather <br /> gloves as necessary._ <br /> Set up necessary traffic control Wear reflective vest for traffic,steel Struck by vehicle during <br /> for method of borehole clearance toed and shank shoes,hardhat,safety placement. Vehicle accident as a Use buddy system for placing traffic guidance and control equipment. <br /> identified to be used(i.e. glasses with side shields,and leather result of improper traffic guidance •Implement traffic guidance and control plan such as setting out delineators,snow <br /> geophysical magnetic,radar,air- gloves as necessary. and control equipment placement. fence and caution tape defining safety area. <br /> knife,hydraulic excavations,etc.). •Adhere to approved Traffic Guidance and Control Plans when working in <br /> roadways. <br /> •It is the responsibility of the SHSO to annotate the Site Plan with the Traffic <br /> Guidance and Control configuration if a formally developed Traffic Guidance <br /> —.___..—._._._—..._—.._.__..._.....__-___............................................... and Control Plan is not available. <br /> Coordinate and assist with set up Wear reflective vest for traffic,steel Vehicle accident during rig <br /> of equipment and/or toed and shank shoes,hardhat,safety movement. Damage caused by Rig mast must be down when moving/repositioning rig. <br /> subcontractor service being used glasses with side shields,and leather rig while accessing set-up •All staff should know where the kill switch is for the drilling rig. <br /> for utility clearance in subsurface gloves as necessary. location. Contact with overhead <br /> installations. Soft terrain. Rig •Verify clear pathway to drilling location and clearance for raising mast. <br /> investigation area Take charge of <br /> site activities and manage site movement. •Provide as-needed hand signals and guidance to driver to place rig. <br /> work and/or subcontractors •Visually inspect rig(fire extinguisher on board,no oil or other fluid leaks,cabling <br /> and associated equipment in good condition,pressurized hoses secured with whip- <br /> checks or adequate substitute,jacks in good condition?). <br /> If necessary,use wooden blocks under jacks to spread load. Chock wheels_ <br /> Set up exclusion zone(s)and Wear reflective vest for traffic,steel Struck by vehicle during set up. <br /> workstations_(drillingand—_ toed and shank shoes hardhat,safety Sli ,tri and fall hazards. Implement exclusion zone set-up. <br /> -- — ----'__.... y ----.p _�... _. _._..._....._....__..............._..__..._... --- — - ----- -................ — — - <br /> PG&E SECOR International Incorporated <br /> SECOR Project No.050T.50234.00.0003 PG&E French Camp <br /> HASPB.doc <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.