My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
401
>
2900 - Site Mitigation Program
>
PR0524769
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 5:08:21 PM
Creation date
1/14/2020 4:25:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524769
PE
2960
FACILITY_ID
FA0016627
FACILITY_NAME
PG&E FRENCH CAMP YARD
STREET_NUMBER
401
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19314013
CURRENT_STATUS
02
SITE_LOCATION
401 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 1 1 .1 1 •1 11 1 1 _ 1.__ _1 _ 1 _1 _ I__ _1 _ _1 _ .1 - 1 _ -11.. . <br /> Field staff must review job-specific workplan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including,but not limited to,permitting,access <br /> agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of each <br /> workda . Plan,Prevent,Execute PPE rocedures must be used throw bout the ro'ect. Weather conditions(heat,cold,rain, li htnin must also be considered. <br /> i Job Steps 0 Personal,ProtectivePotential Hazard a Critical Actions <br /> logging/sample collection). glasses with side shields,and leather •It is the responsibility of the SHSO to annotate the Site Plan with the <br /> gloves as necessary. <br /> Exclusion Zone set up. <br /> •Set up workstations with clear walking paths to and from rig. <br /> •Use safety tape,snow fence,and/or delineators. <br /> •If utilizing Visqueen,(sheet plastic),for sampling area,completely secure <br /> Visqueen to the pavement,dirt,etc.with duct tape,delineators,etc. Do not use <br /> objects that are hard to notice or could become a trip hazard themselves_ _ <br /> Clear upper eight feet of borehole Don required PPE as appropriate for Back strain,exposure to chemical <br /> using method selected(i.e.hand this step: steel toed and shank shoes, hazards,hitting an underground •Initiate air quality monitoring as outlined in Section 12. <br /> excavate,air-knife,etc.). hard hat,safety glasses with side utility,repetitive motion. •Have appropriate respirator with combination organic vapor/P-100 cartridges <br /> shields,hearing protection,reflective within 3-5 feet of work area,readily available. <br /> safety vest,and leather gloves for the <br /> non-chemical aspects of work as •Stand upwind to avoid exposure whenever possible. <br /> necessary.Wear chemical resistant 0 Use the organic vapor monitor/PID aggressively to track the airborne concentration <br /> gloves during handling of soil.Wear of contaminants close to potential sources such as the core as it is being raised from <br /> an air-purifying respirator with the hole,the core is opened,etc. <br /> combination organic vapor/P-100 <br /> cartridges if necessary.(Use a North • If a hand auger is selected as the hole clearance tool,inform drillers that they may <br /> 7600 series full face respirator or its use a mallet to strike the auger bucket to loosen/remove soil. However,one hand <br /> equivalent.Best brand nitrile gloves or should be placed on the connection point between the hand auger bucket and the <br /> their equivalent.Howard Leight Max auger rod and the other hand should be holding the mallet. The hand auger should <br /> foam earplugs with an NRR of 33 or be secured and stable before using a mallet to remove soil from the auger bucket <br /> their equivalent. Tyvek poly coated suit •Make sure spoils from the hole are properly stored,managed and disposed. <br /> or it's equivalent). <br /> •Proceed cautiously and periodically stop to observe conditions in the open hole. <br /> Use a high-beam flashlight or mirror to reflect sunlight into the hole for <br /> observations. <br /> •The diameter of the clearance hole must be at least the diameter of the intended <br /> drilling auger or core device. <br /> •Care should be exercised in identifying resistance to excavation or recalcitrant <br /> objects as they may not appear identifiable until more fully exposed(i.e.you might <br /> break a pipe in the process of clearing the hole before you are aware it is a pipe.Go <br /> Slowly-Visually Check Frequently). <br /> •Evaluate any soil samples inside a Ziploc bag at arm's length. DO NOT <br /> EVALUATE THE SAMPLE WITH THE BAG OPEN. THIS WILL AVOID <br /> UNNECESSARY EXPOSURE. <br /> •Use proper lifting techniques and tools. <br /> •Complete the Pre-Drilling section of the Borehole Clearance Review form. <br /> Avoid twisting back during the operation_Decontaminate equipment after use. <br /> PG&E SECOR International Incorporated <br /> SECOR Project No.050T.50234.00.0003 PG&E French Camp <br /> HASPB.doc <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.