<br /> Field staff must review job-specific workplan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including,but not limited to,permitting,access
<br /> agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of each
<br /> workday. Plan,Prevent,Execute LPPEJ procedures must be used throu hout the ro'ect. Weather conditions(heat,cold, rain,li htnin )must also be considered.
<br /> 0 Job Steps 6 Personal a Critical Actions
<br /> Decontamination will be accomplished by an Alconox wash with tap water rinse
<br /> followed by a de-ionized or distilled water rinse.Collect rinse water in 5 gallon
<br /> buckets and transfer to 55-gallon drums and stage drums(say where it will be
<br /> — ----_ stored).
<br /> - .........._....__........................_......- ...._......_.... ._....._......._........................_._.....__.._..-_......_.__..._._.._.......
<br /> ........._.....................-.......... ....._....__........ ..__.......__.._....---......._....._
<br /> If drilling does not proceed �
<br /> immediately,cover cleared bore
<br /> holes prior to leaving site
<br /> Commence drilling operation. Steel toed and shank shoes,hardhat, Cross-contamination from •Decontaminate sampling after collecting a sample and decontaminate drilling
<br /> safety glasses with side shields, previous hole.Back strain,heat or
<br /> hearing protection,reflective safety cold,eye injury,noise,exposure equipment after each borehole.
<br /> vest,and leather gloves for the non- to chemical hazards,hitting an •Use proper lifting techniques.
<br /> chemical aspects of work as necessary. underground utility,slips,trips
<br /> Wear appropriate air purifying and falls,equipment failure. •Conduct air monitoring as outlined in Section 12.
<br /> respirator with combination organic •Have appropriate respirator with combination organic vapor/P-100 cartridges
<br /> vapor/P-100 cartridges if needed.Wear within 3-5 feet of work area,readily available.
<br /> chemical resistant gloves if needed.
<br /> •Monitor drilling progress.
<br /> •Keep work area clear of tripping or slipping hazards.
<br /> _.�_ •Perform.periodic visual inspections of drill rI$:..._....___.._._..___.__....__.__._.._......................__...........-_._.................
<br /> If drilling does not proceed Steel toed and shank shoes,hardhat, Tripping, wretched 0 Appropriate methods of covering a cleared bore hole can include 1)steel drive
<br /> immediately,cover cleared bore safety glasses with side shields, ankles, broken
<br /> holes prior to leaving site hearing protection,reflective safety limbs, foreign plates affixed to surrounding pavement capable of enduring site traffic without
<br /> vest,and leather gloves for the non- dislocating 2)A sealed 55-gallon steel drum with some soil or water in it to add
<br /> objects or weight,placed over the bore hole and surrounded by delineator cones or horses
<br /> chemical aspects of work as necessary. substances
<br /> Wear appropriate air purifying (flashers optional)or 3)(preferred method)Backfill open,cleared borehole with
<br /> introduced into clean sand to within 2-inches of surface grade and place compacted asphalt cold-
<br /> respirator with combination organic
<br /> vapor/P-100 cartridges if needed.Wear cleared bore holes patch matched to surface grade.
<br /> chemical resistant gloves if needed.
<br /> Collect samples in accordance Steel toed and shank shoes,hardhat, Cross-contamination,improper •Evaluate any soil samples inside a Ziploc bag at arm's length. DO NOT
<br /> with sampling plan. safety glasses with side shields, labeling or storage,exposure to EVALUATE THE SAMPLE WITH THE BAG OPEN. THIS WILL AVOID
<br /> hearing protection,reflective safety site contaminants,Back strain, UNNECESSARY EXPOSURE. .
<br /> vest,and leather gloves for the non- Inhalation or dermal exposure to
<br /> chemical aspects of work as necessary. chemical hazards. •Decontaminate sampling equipment between each sampling run. Label samples in
<br /> Wear appropriate air purifying accordance with sampling plan.
<br /> respirator with combination organic
<br /> vapor/P-100 cartridges if needed. •Conduct air monitoring as outlined in Section 12.
<br /> Level D PPE with nitrile gloves, •Decontaminate sampling equipment between each well(unless disposable).
<br /> exclusion Zone Equipment.
<br /> •Use proper lifting and bending techniques. Use knee pads or a kneeling pad.
<br /> •Determine the best location to set the sample containers(avoid stepping on them,
<br /> or other materials coming into contact with them).
<br /> __......... ........_......._-.......—_.._......_........._.-.-_._.0 Label samples in accordance with sampling plan__ _._..._._._.....