Field staff must review job-specific work plan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including,but not limited to,permitting,access <br /> agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of each <br /> workday. Plan,Prevent,Execute PPE rocedures must be used throu bout the ro'ect. Weather conditions heat,cold,rain,li htnin must also be considered. <br /> 0 Job Steps 0 Person al'Protective Equipment 4) Potential Hazard a Critical Actions <br /> chemical aspects of work as necessary. particulate to prevent storm water intrusion,slope concrete skirt gradually). <br /> If you suspect that equipment is inhalation, slip, <br /> contaminated,wear chemical resistant • Maintain traffic guidance and control and face oncoming traffic. <br /> trip and fall <br /> gloves.Wear appropriate air purifying hazards. Traffic •Perform air monitoring as outlined in Section 12. <br /> respirator with combination organic <br /> vapor/P-100 cartridges as needed. hazards. •Have appropriate respirator with combination organic vapor/P-100 cartridges <br /> ....................I...................................._within-3.-5 feet of work area,readily available:............_.._....._....__..........._........................_....... <br /> ......._......_....._.__.................... <br /> Develop well by hand bailing or Steel toed and shank shoes,hardhat, Physical injury from mechanical <br /> vacuum truck safety glasses with side shields, failure vacuum truck. Trip •Make sure equipment is in good working order and pressurized hoses are whip- <br /> hearing protection,reflective safety hazard.Exposure to checked. <br /> vest,and leather gloves for the non- contaminants. Cross- • Perform air monitoring as outlined in Attachment 6. <br /> chemical aspects of work as necessary. contamination. Electric shock. <br /> Wear appropriate air purifying Back strain. •Have appropriate respirator with combination organic vapor/P-100 cartridges <br /> respirator with combination organic within 3-5 feet of work area,readily available. <br /> vapor/P-100 cartridges as needed. •Keep work area orderly. <br /> •Decontaminate all equipment going into well. <br /> Any generators must be equipped with GFCI circuit. <br /> ---—..........-........... <br /> Gauge water levels and product Steel toed and shank shoes,hardhat, Back strain,inhalation or dermal <br /> thickness(where applicable)in safety glasses with side shields, exposure to chemical hazards, •Perform air monitoring as outlined in Attachment 6. <br /> wells. hearing protection,reflective safety repetitive motion. •Have appropriate respirator with combination organic vapor/P-100 cartridges <br /> vest,and chemical resistant gloves as within 3-5 feet of working location for quick access. <br /> necessary.Wear appropriate air <br /> purifying respirator with combination •Maintain safe distance from wellhead. <br /> organic vapor/P-100 cartridges as •Bend at knees,not at the waist. <br /> needed.Wear chemical resistant suit as <br /> needed. <br /> — -- — --- --..__....n..... _... .._.._..._._..- -----.........._-.................... <br /> -- ....—.. —-----...------------ ----....- - <br /> Purge well(s)and collect purge Steel toed and shank shoes,hardhat, Cross-contaminatio ...._.._...Back..-- •Decontaminate purging equipment between each sampling location.Two methods <br /> water.Purging of the wells can be safety glasses with side shields, strain,inhalation or dermal of equipment decontamination will be used on this site. If disposable bailers are <br /> done by using one of two hearing protection,reflective safety exposure to chemical hazards,slip <br /> used,then they will be properly disposed of. If the bailers are reusable,then they <br /> methods,by hand bailer or vest,and leather gloves for the non- and fall. Spilling contaminated <br /> vacuum truck.If a hand bailer is chemical aspects of work.If you water. will be washed in an Alconox wash,rinsed with tap water,then rinsed with de- <br /> used,collected water will be suspect that equipment is ionized or distilled water.Decontamination water will be transferred to 55-gallon <br /> transferred to a 55-gallon drum. contaminated,wear chemical resistant drums and staged <br /> gloves as necessary.Wear appropriate •Perform air monitoring as outlined in Section 12. <br /> air purifying respirator with <br /> combination organic vapor/P-100 •Have appropriate respirator with combination organic vapor/P-100 cartridges <br /> cartridges as needed.Wear chemical within 3-5 feet of working location,readily available. <br /> resistant suit as needed. •Keep work area clear of tripping or slipping hazards. <br /> 0 Store purge water in 55-gallon drums and stage _.....__....._.........._.__..................._.._._._.__....__._..._............._....__......_.. <br /> _--------------.................................---_-..._.._. <br /> Collect groundwater samples in Steel toed and shank shoes,hardhat, Cross-contamination.Back strain, •Decontaminate sampling equipment between each well(unless disposable). <br /> accordance with sampling plan. safety glasses with side shields, inhalation or dermal exposure to <br /> hearing protection,reflective safety chemical hazards,slip and fall. •Use proper lifting techniques.Use knee pads or a kneeling ad. <br /> _........_......._..__...-_.......__..——......_._..._.........._.._._.._.._......_.._..._......._.._............................_......_.__...._......_............................_....__.......---............__......_.......--......_......---------_. _...........-............_............__....--._.....--------g...---......................._._......_......_.._._...........__. <br /> PG&E SECOR International Incorporated <br /> SECOR Project No.050T.50234.00.0003 PG&E French Camp <br /> HASPB.doc <br /> 23 <br />